Exhibit A—Description & Justification of Changed Work <br /> The work within this project encompassed the blasting of rock and forested hillside within the <br /> City's Water Shed in order to relocate a deteriorating gravel roadway; thus, making it safe for <br /> daily travel. Once the work progressed it became obvious that the quantities of rock and <br /> overburden material were going to be much larger than anticipated. The Contractor was <br /> instructed to proceed knowing an adjustment of quantities would be necessary at the close of <br /> the project. This Change Order#1 represents these adjustments as follows. <br /> Bid Description Additional <br /> Item Cost <br /> 3 38 additional drill holes were required for blasting @ the unit price of $8,740.00 <br /> $230.00 per each. <br /> 4 2,345 additional cubic yards of material were hauled @ the unit price $35,175.00 <br /> of$15.00 per CY. <br /> 5 4,220 additional cubic yards of rock were crushed for use as gravel @ $48,530.00 <br /> the unit price of$11.50 per CY. <br /> 8 60 additional cubic yards of surfacing material were placed on the $1,200.00 <br /> roadway @ the unit price of$20.00 per CY. <br /> 18 Force Account Credit for dollars not used on this item. ($9,700) <br /> Total $83,945.00 <br /> 4 CO#1 <br />