My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2021
>
Jacobs Engineering Group Inc. 4/2/2020 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 10:57:27 AM
Creation date
4/22/2020 10:57:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Group Inc.
Approval Date
4/2/2020
Council Approval Date
3/18/2020
End Date
12/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Force Main Condition Assessment/Redundancy
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001468
Total Compensation
$187,172.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Jacobs Engineering Group 11/2/2018
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3:Task 8 Plan List <br /> To be submitted as one bid-set package Subtask <br /> Sheet# Title <br /> Subtask 8.2 Subtask 8.3 Subtask 8.4 8.5 <br /> 0 Cover X Xa <br /> 1 Location/Vicinity,Index X <br /> 2 Legend,Abbreviations, Symbols X <br /> 3 General Notes X Xb <br /> 4 Site Plan/Survey Control X <br /> 5 TESC/Demo Plan X <br /> 6 Intertie Plan X <br /> 7 Intertie Profiles-Sections X <br /> 8 Intertie Details X <br /> 9 Intertie Details X <br /> 10 Overflow Structural Penetration Detail X <br /> 11 Manhole Plan X <br /> 12 Manhole Elevation X <br /> 13 Manhole Details X <br /> 14 Access Hatch Replacement Plan/Section X <br /> 15 Access Hatch Replacement Details X <br /> 16 Restoration Plan X <br /> 17 Restoration Details X <br /> 18 Miscellaneous Details X <br /> 19 Valve Vault Slab Plan X <br /> 20 Valve Vault Section&Details X <br /> Notes: <br /> a. The cover will include the location/Vicinity/Index information. <br /> b. We will try to include the general notes on the plan sheet. <br /> Table 4: Task 8 Specifications List <br /> To be submitted as one bid-set package <br /> # Title <br /> Subtask 8.2 Subtask 8.3 Subtask 8.4 <br /> 2-02 Removal of Structures and Obstructions X X X <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.