My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 14 ' <br /> 2020 Biosolids Removal UT3705-11 <br /> 4.4.11. Emergencies , <br /> In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent <br /> thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor shall give <br /> Owner's Representative prompt written notice if Contractor believes that any significant changes in the <br /> Work or variations from the Contract Documents have been caused thereby or are required as a result <br /> thereof. If Owner's Representative determines that a change in the Contract Documents is required be- <br /> cause of the action taken by Contractor in response to such an emergency, a Work Change Directive or <br /> Change Order will be issued. <br /> 4.4.12. Trench Excavation , <br /> For all french excavations that exceed a depth of four feet,the Contractor must use adequate safety <br /> systems that meet the requirements of the Washington Industrial Safety and Health Act, chapter 49.17 <br /> RCW. <br /> 4.5. OWNER-CONTRACTOR COORDINATION <br /> 4.5.1. Service of Notice <br /> Contractor agrees that any Notice, order, direction,request or other communication by the Owner's <br /> Representative or Owner to the Contractor shall be deemed received by the Contractor if left at any office <br /> used by the Contractor or delivered to any of the Contractor's officers, clerks or employees or posted at <br /> the site of the Work or mailed to any post office addressed to the Contractor at the address given in the <br /> Contract Documents or mailed to the Contractor's last known place of business. If mailed,any form of <br /> communication will be deemed to have been given to and received by the Contractor the day after the day <br /> of mailing. <br /> 4.5.2. Suggestions to Contractor I <br /> Nothing in these Contract Documents requires the Owner's Representative to provide the Contractor with <br /> direction or advice on how to do the Work, construction practices, or means and methods. If the Owner's <br /> Representative approves, suggests or recommends any construction practice,means,method or manner ' <br /> for doing the Work or producing materials,the approval or recommendation shall not: (A)guarantee that <br /> following the method or manner will result in compliance with the Contract Documents; (B)relieve the <br /> Contractor of any risks or obligations under the Contract Documents; or(C)create any liability by the <br /> Owner to the Contractor. <br /> Suggestions as to the plans or methods of accomplishing the Work or Contract requirements by the <br /> Owner or the Owner's Representative to the Contractor but not specified or required, if adopted or ' <br /> followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the <br /> Contractor. The Owner and the Owner's Representative assume no responsibility therefor and in no way <br /> will be held liable for any defects in the Work which may result from or be caused by use of such plan or <br /> method or Work. <br /> 4.5.3 Meetings with Owner <br /> The Contractor shall have its duly authorized representative attend periodic informational meetings with ' <br /> the Owner's Representative and City staff,as reasonably required by the Owner. <br /> Contractor, Owner, and Owner's Representative shall meet as often as determined by the Owner's <br /> Representative,but no less often than once each month. The purpose of the meeting is to review Project <br /> status in relation to the construction schedule;review value of Work completed during the previous <br /> month; and, if applicable,review Contractor's plans to return Project status to that required by the <br /> schedule. If requested by the Owner or Owner's Representative,the Contractor shall submit a written <br /> progress report within five(5)days following this meeting,comprising: <br /> 1 <br /> 00 7200 - 14 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.