My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 21 <br /> 2020 Biosolids Removal UT3705-11 <br /> ' between Owner and Contractor,beginning of warranties, and any other issues relating to Substantial <br /> Completion shall be as specified in 5.7.SUBSTANTIAL COMPLETION. <br /> 5.7. SUBSTANTIAL COMPLETION <br /> When the Contractor considers the Work to be Substantially Complete and ready for its intended use, it <br /> ' shall give Notice to the Owner's Representative. The Notice shall include an itemized list of remaining <br /> incomplete Work. If the Owner's Representative determine the Work is not substantially complete,the <br /> Contractor will be notified in writing, identifying the reasons for such a determination. If the Owner's <br /> ' Representatives find the Work substantially complete,he or she will meet with the Contractor to(1) <br /> prepare a Punch List of incomplete items of Work; (2)define the division of responsibility between <br /> Owner and Contractor with respect to security, operation,maintenance,heat,utilities, insurance,and <br /> warranties; and(3)describe any other issues related to acceptance of the substantially completed Work. <br /> If the Owner's Representative is not an employee of the Owner,the Owner's Representative will write to <br /> the Owner upon reaching agreement with the Contractor, certifying that the Work is substantially <br /> ' complete, listing the items of incomplete Work, stating the date for completion of incomplete Work, <br /> defining the division of responsibilities, and setting forth any other terms related to acceptance. In such <br /> event,the Owner will review the Owner's Representative's certification that the Work is substantially <br /> ' complete. If the Owner concurs,the Owner will notify the Contractor in writing that the Work is <br /> accepted as substantially complete. Except for any portion(s)of Work specified for early completion or <br /> required by the Owner for early possession, Substantial Completion will not occur for any Work until the <br /> entire Project is ready for possession and use. The acceptance notice will include a Punch List of <br /> ' incomplete Work items and corrective Work, set the date for their completion and repair,describe the <br /> division of responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing,indicating acceptance of all <br /> ' of its terms and provisions. <br /> Subsequent to the Substantial Completion date,the Owner may exclude the Contractor from the Work <br /> during such periods when construction activities might interfere with the intended operation of the <br /> ' Project. The Owner,however, shall allow the Contractor reasonable access for completion or correction <br /> of incomplete Punch List items. <br /> ' 5.8. ACCEPTANCE OF WORK <br /> Upon completion of the Project,including,but not limited to,record drawings,as-builts,required reports <br /> and operations and maintenance manuals,the Contractor shall so notify the Owner's Representative in <br /> writing. Upon receipt of the notification,the Owner's Representative will promptly,by personal <br /> inspection,determine the actual status of the Work in accordance with the terms of the Contract. If the <br /> Owner's Representative finds materials,Equipment, or workmanship that do not meet the terms of the <br /> ' Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> ' determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> ' 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> ' The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety, and the Contractor agrees to perform the Work as changed.Among <br /> others,these changes and alterations may include: <br /> 00 7200 - 21 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.