My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' City of Everett 00 7200 - 23 <br /> 2020 Biosolids Removal UT3705-11 <br /> ' Contract Sum shall be reduced by fifty percent(50%)of the direct,actual construction cost saved. <br /> Because the Owner has the sole discretion whether to consider,accept or reject the Contractor's proposal <br /> and the Contractor has no right to require the Owner to consider or accept such proposals,the Owner's <br /> decision is not reviewable by any court. This subsection applies only to change proposals initiated solely <br /> by the Contractor(or its Subcontractors and Suppliers)and does not apply to change proposals requested <br /> ' or initiated by the Owner or the Owner's Representative. The Owner is not obligated or required to <br /> consider any Contractor initiated change proposals and may, in its sole discretion,refuse to do so. Under <br /> no circumstances shall the Contractor be entitled to additional compensation arising out of, or related to, <br /> ' the Owner's refusal to consider or approve a Contractor initiated change proposal. The Contractor shall <br /> not do any of the following without the express written agreement of the Owner: fail to perform any <br /> Work; commence performance of any proposed change;reduce its resources assigned to performance of <br /> the Work in order to prepare a change proposal or in anticipation of approval of a change proposal; adjust <br /> or change the project schedule or take any action or fail to do any action that would affect the Completion <br /> Date of the Work;take any action or fail to take any action arising out of the Contractor's change <br /> ' proposal that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br /> 7. LABOR STANDARDS <br /> ' 7.1. WAGES OF EMPLOYEES <br /> 7.1.1. General <br /> Pursuant to the requirements of Chapter 39.12 RCW,the Contractor and each Subcontractor or other <br /> person doing the whole or any part of Work to be performed under this Contract in the State of <br /> Washington shall pay each employee working in the State of Washington an amount not less than the <br /> general prevailing rate of wage, as specified by the Industrial Statistician of the Department of Labor and <br /> Industries of Washington State,paid in the vicinity of the Work to be performed under this Contract for <br /> the particular grade or occupation of each employee <br /> ' Any employee whose type of work is not covered by any of the classified wage rates specified by the <br /> Industrial Statistician shall be paid not less than the rate of wage listed for the classification that most <br /> nearly corresponds to the type of work performed. <br /> ' In case any Dispute arises as to what are the prevailing rates of wages for work of a similar nature that <br /> cannot be adjusted by the parties in interest, including labor and management representatives,the matter <br /> shall be referred for arbitration to the Director of the Department of Labor and Industries of the State of <br /> ' Washington, and his or her decision therein shall be final and conclusive and binding on all parties <br /> involved in the Dispute. The schedule of prevailing wage rates as determined by the Industrial <br /> Statistician for the locality or localities where this Contract will be performed are by this reference made a <br /> ' part of this Contract as though fully set forth herein. The Contractor shall be held responsible for <br /> notifying its Subcontractors of these wage requirements. Failure by either the Contractor or any <br /> Subcontractors to comply with requirements of Chapter 39.12 RCW will result in delay of payment to the <br /> Contractor and/or imposition of other sanctions as may be available under the law and this Contract. <br /> 7.1.2. Contractor's Responsibility <br /> The Contractor will be held responsible for paying not less than the prevailing wages, including increases <br /> ' in such wages, over the term of this agreement. It is,therefore, imperative that the Contractor and its <br /> Subcontractors familiarize themselves with the wage rates before submitting bids based upon these <br /> Specifications. <br /> 7.1.3. Federal Labor Requirements <br /> Contractor shall comply with applicable federal laws and regulations relating to workers, safety and labor. <br /> ' 00 7200 - 23 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.