City of Everett 00 7200 - 25
<br /> 2020 Biosolids Removal UT3705-11
<br /> ' appropriate governmental agency or state or federal courts to limit the location of such picketing so as to
<br /> reduce the impact thereof upon neutral employers.
<br /> ' The Owner will cooperate with the Contractor to accomplish the foregoing actions and will render
<br /> assistance as may be in the best interests of the Owner. However,the Owner shall have the right to direct
<br /> the Contractor to modify any of the foregoing actions the Contractor has taken or plans to take or to
<br /> overrule such actions,to designate the entrances to be used as "primary" or"neutral"entrances,and to
<br /> take appropriate legal action in order to protect the Owner's property and interests. In any event,the
<br /> Contractor shall be liable for all Delays and costs, including costs to the Owner,and actual damages
<br /> resulting from the relocation,rerouting,Delays or actions required to maintain the uninterrupted progress
<br /> of the Work. Failure by the Contractor to take the actions described above or to comply with the
<br /> directives of the Owner shall be considered a breach of this Contract and the Owner may terminate the
<br /> ' Contract or suspend the Contractor as provided in this Contract.
<br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES
<br /> 8.1. GENERAL
<br /> Unless otherwise specifically stated in the Contract Documents,the Contractor shall provide and pay for
<br /> ' materials, labor,tools,Equipment,water, light,power,transportation, supervision,and temporary
<br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary,to
<br /> execute, complete and deliver the Work within the specified time. Contractor shall be liable for all power
<br /> and water costs until Substantial Completion,whether such power or water is provided by temporary or
<br /> permanent facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the
<br /> availability or lack of availability of permanent power or utilities. Material and Equipment shall be new
<br /> ' and of the specified quality. Equipment offered shall be new or current specified models. This
<br /> requirement does not apply to minor details, or to thoroughly demonstrated improvements in design or in
<br /> materials of construction. Construction Work shall be executed in conformity with the standard practice
<br /> of the trade.
<br /> 8.2. PRODUCT DATA
<br /> When specified,the Contractor shall provide data required for inspecting,testing,operating,or
<br /> maintaining parts of the Work. Unless otherwise specified, such data shall be provided at the time the
<br /> referenced material or Equipment is delivered to the job Site. The data shall be as specified and shall
<br /> include,unless otherwise specified, such items as shop drawings,erection drawings,reinforcing steel
<br /> schedules,testing and adjusting instructions, operations manuals,maintenance procedures,parts lists,and
<br /> record drawings. Such data shall be provided as part of the Work under this Contract and its acceptability
<br /> determined by the Owner in its sole discretion.
<br /> 8.3. QUALITY
<br /> Where detailed Specifications of materials,Equipment,or construction Work are not set forth,the
<br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the
<br /> materials and workmanship specified for the other parts of the Work, from firms of established good
<br /> reputations, and shall follow standard practices to perform construction Work of good quality in a
<br /> ' workmanlike way. Work performed shall be in conformity and harmony with the intent to secure the
<br /> standard of construction and Equipment of Work as a whole and in part. All Work must comply and
<br /> conform to applicable building codes in effect when the Work is performed.
<br /> 8.4. MATERIAL AND EQUIPMENT SPECIFIED BY NAME
<br /> When material or Equipment is specified by reference to patents,brand names,or catalog numbers,the
<br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer
<br /> ' substitutions of products it considers to be equal to that specified,but the Owner is not obliged or required
<br /> to consider or accept such offered substitution.
<br /> 111 00 7200 - 25 GENERAL CONDITIONS
<br />
|