Laserfiche WebLink
ICity of Everett 00 7200 - 29 <br /> 2020 Biosolids Removal UT3705-11 <br /> Iany specific provision of the Contract Documents,any Work is found to be defective, or if the repair of <br /> any damages to the land or areas made available for Contractor's use by Owner or permitted by Laws and <br /> I Regulations as contemplated in Paragraph 8.6.6. is found to be defective, Contractor shall promptly, <br /> without cost to Owner and in accordance with Owner's written instructions: <br /> repair such defective land or areas; or <br /> I1. <br /> 2. correct such defective Work; or <br /> 3. if the defective Work has been rejected by Owner,remove it from the Project and replace it with <br /> I Work that is not defective,and <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work,to the work of <br /> others or other land or areas resulting there from. <br /> IIf Contractor does not promptly comply with the terms of Owner's written instructions, or in an <br /> emergency where Delay would cause serious risk of loss or damage, Owner may have the defective Work <br /> corrected or repaired or may have the rejected Work removed and replaced.All claims,costs, losses, and <br /> I <br /> damages(including but not limited to all fees and charges of engineers,architects,attorneys,and other <br /> professionals and all court or arbitration or other dispute resolution costs)arising out of or relating to such <br /> correction or repair or such removal and replacement(including but not limited to all costs of repair or <br /> Ireplacement of Work of others)will be paid by Contractor. <br /> The Owner is hereby authorized to make such repairs if,ten(10)days after giving of such notice to the <br /> Contractor,the Contractor has failed to make or undertake the repairs with due diligence. In case of an <br /> I emergency where, in the opinion of the Owner,Delay could cause serious loss or damage,repairs may be <br /> made prior to or concurrent with notice being sent to the Contractor. All expenses in connection with <br /> such repairs will be charged to the Contractor. <br /> IIn special circumstances where a particular item of equipment is placed in continuous service before <br /> Substantial Completion of all the Work,the correction period for that item may start to run from an earlier <br /> date if so provided in the Specifications. <br /> IWhere defective Work(and damage to other Work resulting there from)has been corrected or removed <br /> and replaced under this Paragraph 8.7,the correction period hereunder with respect to such Work will be <br /> extended for an additional period of one year after such correction or removal and replacement has been <br /> Isatisfactorily completed. <br /> Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation or warranty.The <br /> I provisions of this Paragraph 8.10 shall not be construed as a substitute for or a waiver of the provisions of <br /> any applicable statute of limitation or repose. <br /> I9. MEASUREMENT AND PAYMENT <br /> 9.1. PAYMENTS TO CONTRACTOR <br /> I 9.1.1. Schedule of Values <br /> The Contractor shall submit a Schedule of Values at least fifteen(15)days prior to submitting its first <br /> Application for Payment. If the Project contains Unit Price Work,in whole or in part,then the Schedule <br /> I of Values for that portion of the Work shall also be based on unit prices. If the Bid form calls for a lump <br /> sum price,in whole or in part,then the Schedule of Values shall: reasonably allocate the Contract Sum <br /> among the various portions of the Work;be complete;be organized to include detailed breakdown of each <br /> 1 major unit of the Work;be organized to correspond to Contractor's schedule;break down the Contract <br /> Sum showing the value assigned to each part of the Work;include an allowance for profit and Overhead; <br /> include Unit Price Work, if and to the extent indicated on the Bid form;be so organized as to facilitate <br /> I assessment of work and payment of Subcontractors;and be balanced. To the greatest extent possible,the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor shall provide <br /> documentation substantiating the cost allocation if asked by the Owner's Representative. Upon <br /> I00 7200 - 29 GENERAL CONDITIONS <br />