My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 2113 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> I <br /> SECTION 00 2113 - INSTRUCTIONS TO BIDDERS <br /> I <br /> 1.1 GENERAL DESCRIPTION AND LOCATION OF PROJECT <br /> IA. The Work to be performed will include furnishing all labor, materials and <br /> equipment necessary to perform all Work as required by the Contract in <br /> Iaccordance with the Contract Documents. <br /> B. The Project Site is located at 4027 4th Street Southeast, Everett WA. <br /> I1.2 PROJECT MANAGER <br /> I A. Questions and inquiries about the Contract Documents should be directed to the <br /> attention of John Nottingham, City of Everett Project Manager at (425) 257-8844 <br /> or email JNottingham@everettwa.gov. <br /> 1.3 STANDARD SPECIFICATIONS <br /> IA. The following other Specifications and Standard Plans shall apply to the extent <br /> to which they are called out in the Contract Documents. <br /> I 1. WSDOT "2012 Standard Specifications for Road, Bridge and Municipal <br /> Construction", as amended by the APWA Supplements, hereinafter referred <br /> to as the "Standard Specifications." <br /> I 2. City of Everett "Design and Construction Standards and Specifications" <br /> (Revised January 2020), as found online on the City's Website at: <br /> https://everettwa.gov/1531/Desig n-Construction-Standards <br /> I <br /> 3. "Standard Plans for Road and Bridge Construction," latest edition as <br /> prepared by WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> I 5. APWA Standards, latest edition. <br /> 6. AWWA Standards, latest edition. <br /> 7. American Concrete Institute (ACI), latest edition <br /> 1.4 EXAMINATION OF SITE CONDITIONS, CONTRACT DOCUMENTS AND <br /> IREGULATIONS <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract <br /> I Documents to satisfy themselves, by personal examination, physical testing, or <br /> by such other means as they may prefer, of the location of the proposed Work, <br /> the actual physical conditions of and at the Site, surface and subsurface <br /> I conditions, and conditions ordinarily to be encountered and generally recognized <br /> as inherent in the Work. If, during the course or as a result of such inspection, <br /> I00 2113 - 1 INSTRUCTIONS TO BIDDERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.