My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7300 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 00 7300 - SPECIAL CONDITIONS <br /> 1.1 SUMMARY <br /> ' A. The following "Special Conditions" shall supplement the General Conditions and <br /> shall become a part of this contract. <br /> 1.2 SUBMITTALS <br /> A. Prior to mobilization the following submittals shall be submitted to the City for <br /> review and approval. <br /> 1. Proposed dewatering agents and the estimated quantity. <br /> 2. Contractor's Spill Prevention Plan (See example in Appendix C). <br /> 3. Dredging and dewatering work plans. <br /> ' 4. Health and Safety Plan (specific to this project— see example in Section 01 <br /> 3529 section 1.5) <br /> 1.3 PROJECT LOGISTICS <br /> ' A. Power and Water Service <br /> 1. See Temporary Facilities Section 01 5000 <br /> ' B. Parking <br /> 1. Contractor parking shall be within the perimeter of the facility and not <br /> interfere with parking for neighboring recreational areas. <br /> C. Storage and Staging <br /> 1. Contractor will be responsible for storage of materials and equipment prior <br /> ' to commencing the Work. Staging of material and equipment during the <br /> project will be located in designated areas within the perimeter of the <br /> Biosolids Pad. Contractor shall minimize interference and disruption to <br /> ' plant operations, other construction activities, or internal plant vehicle traffic. <br /> Available space within the immediate area where work is to be performed <br /> will be available for the contractor to stage material and locate a solid waste <br /> ' dumpster. <br /> D. Solid Waste Disposal <br /> ' 1. Contractor shall collect solid waste produced from his/her operations on a <br /> daily basis. <br /> 2. Contractor shall provide for disposal of solid waste to approved solid waste <br /> ' disposal site(s). <br /> 00 7300 - 1 SPECIAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.