My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7343 - 1 <br /> 2020 Biosolids Removal UT3705-11 <br /> SECTION 00 7343 - WAGE RATE REQUIREMENTS <br /> 1.1 SPECIFICATION REFERENCE <br /> A. Section 00 7200 — GENERAL CONDITIONS, Part 7.1 "Wages of Employees". <br /> 1.2 WORK LOCATION <br /> A. All Work performed within Snohomish County, WA. <br /> 1.3 PREVAILING WAGE REQUIREMENTS <br /> A. Contractor agrees to comply with all state and federal laws relating to the <br /> ' employment of labor and wage rates to be paid. The hourly wages to be paid to <br /> laborers, workers, or mechanics shall be not less than the prevailing rate of wage <br /> for an hour's work in the same trade or occupation in Snohomish County. <br /> 1. Washington State Prevailing Wage Rates for Snohomish County, effective <br /> 1/28/2020; Benefit Code Key, effective 1/28/2020 are, by reference, made <br /> a part of this Contract. <br /> 2. Prevailing wage rates can be accessed at the following URL: <br /> http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp <br /> 3. Printed copies of the current prevailing wage forms are available upon <br /> ' request. <br /> B. In the preparation of its Bid, based on these Specifications, the Bidder is solely <br /> responsible to <br /> 1. Use the schedule in effect at the time of the Bid Opening Date and time, <br /> 2. Determine the appropriate labor classification(s); and <br /> 3. Utilize the appropriate and correct prevailing wage and benefit rate(s). <br /> C. No payment will be made on this Contract until the Contractor and each <br /> Subcontractor has submitted a "Statement of Intent to Pay Prevailing Wages", <br /> form F700-029-000, which has been approved by the industrial statistician of the <br /> Department of Labor and Industries. <br /> ' D. No final payment or release of retainage will be made until the Contractor and <br /> each Subcontractor has submitted an "Affidavit of Wages Paid", form F700-007- <br /> '1 000, which has been certified by the industrial statistician of the Department of <br /> Labor and Industries. <br /> E. Post the prevailing rate of wage statement in a location readily visible to workers <br /> at the job site, or as allowed by RCW 39.12.020. The "Statement of Intent to Pay <br /> Prevailing Wages" shall include: <br /> 00 7343 - 1 WAGE RATE REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.