Laserfiche WebLink
Cityof Everett - I <br /> 012973 4 <br /> 2020 Biosolids Removal UT3705-11 I <br /> 2. Description of Work. <br /> 3. Name of subcontractor. <br /> 4. Scheduled Value for each Item of Work. I <br /> 5. Pervious Work Complete, including Cost Value and Percent Complete. <br /> 6. Present Work Complete, including Cost Value and Percent Complete. <br /> 7. Change Orders (numbers) that affect value. I <br /> 8. Total Billing, including Billing to Date, Percent of Contract Sum, and <br /> Balance to Finish. Show dollar value as percentage of Contract Sum to <br /> nearest one-hundredth percent, adjusted to total 100 percent. I <br /> 9. Retainage. <br /> 10. Stored Material. <br /> 111 <br /> 1.7 COST CATEGORIES <br /> A. Assign following, making sum equal to total cost for each line item activity to I <br /> show initial costs of work activity and total installed cost. <br /> 1. Labor. <br /> 2. Equipment. <br /> 3. Material. I <br /> 4. Subcontractor. <br /> 5. Overhead and Profit. <br /> 6. Total Cost. I <br /> B. Show total sum for each cost category as well as total cost for each work <br /> activity. I <br /> END OF SECTION 01 2973 <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> 01 2973 - 4 SCHEDULE OF VALUES <br /> I <br />