Laserfiche WebLink
I <br /> and first aid supplies, field surveys, sanitation needs and all other facilities required <br /> by these specifications, and State and local laws and regulations. The costs of <br /> bonds, permits, and any required insurance, and any other preconstruction expense <br /> necessary for the start of the Work shall also be included. This Work also consists of <br /> the general project management of the Work including, but not limited to, field <br /> supervision and office management, as well as other incidental cost for management ' <br /> of the Work during the duration of the Contract. This lump sum price shall not <br /> exceed 10% of the total of all bid items." <br /> Item 2 - RESPONSES TO QUESTIONS RECEIVED: <br /> (a) Notice to Proceed will be issued late April. <br /> (b) A City of Everett business license is required to do work under this project, ' <br /> but is not required to bid on the project. <br /> (c) Al insurance requirements within Section 00 72 00, Item 15 shall stand with <br /> no modifications. <br /> Attachments: <br /> Pre-bid meeting sign-in sheets (2) <br /> END OF ADDENDUM , <br /> I <br /> Addendum 1 Page 2 of 2 ' <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425)257-8800 • Fax(425)257-8882 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa_com-Always Verify Scale <br />