My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
American Process Group Inc 4/15/2020
>
Contracts
>
Capital Contract
>
American Process Group Inc 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 1:12:34 PM
Creation date
4/22/2020 1:06:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
American Process Group Inc
Approval Date
4/15/2020
Council Approval Date
3/25/2020
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2020 Biosolids Removal
Public Works WO Number
UT3705-11
Tracking Number
0002295
Total Compensation
$673,710.84
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - iv I <br /> 2020 Biosolids Removal UT3705-11 <br /> 9.6.2. Materials. 36 I <br /> 9.6.3. Equipment. 37 <br /> 9.6.4. For Services 37 I <br /> 9.6.5. For Mobilization. 38 <br /> 9.6.6. For Contractor Markup on Subcontractor's Work 38 <br /> 9.7. Retainage 39 111 <br /> 10. NOTICE TO OWNER 39 <br /> 10.1 When Notice Must Be Given 39 II <br /> 10.2 Form of Notice 40 <br /> 10.3 Supplemental Information 40 I <br /> 11. DIFFERING SITE CONDITIONS 41 <br /> 12. CONTRACT CLAIMS 41 <br /> 12.1 General 41 I <br /> 12.2 Contents 42 <br /> 12.3 FALSE OR OMITTED INFORMATION 43 I <br /> 12.4 Remedies 44 <br /> 12.4.1 General 44 <br /> 12.4.2 Extra Work 44 ' <br /> 12.4.2.1 Adjustment of Contract Sum 44 <br /> 12.4.2.2 Extension of Contract Time 44 <br /> 12.4.3 Delays 44 1 <br /> 12.4.3. Owner Caused Delay Unrelated to Extra Work 44 <br /> 12.4.3.1.1 Adjustment of Contract Sum 44 <br /> 12.4.3.1.2 Adjustment of Contract Time 44 I <br /> 12.4.3.2 Contractor Caused Delay 44 <br /> 12.4.3.3 Delays Concurrently Caused by Contractor and Owner 45 <br /> 12.4.3.3.1 Adjustment of Contract Sum 45 <br /> 12.4.3.3.2 Adjustment of Contract Time 45 <br /> 12.4.3.4 Third Party Caused Delays and Force Majeure 45 ' <br /> 12.4.3.4.1 Caused Solely by Third Parties or Force Majeure 45 <br /> 12.4.3.4.1.1 Adjustment of Contract Sum 45 <br /> 12.4.3.4.1.2 Adjustment of Contract Time 45 <br /> 12.4.3.4.2 Caused Concurrently by Third Parties and Contractor or Owner 45 <br /> 12.4.3.4.2.1 Adjustment of Contract Sum 45 <br /> 12.4.3.4.2.2 Adjustment of Contract Time 45 I <br /> 12.4.3.5 Extended or Unabsorbed Overhead 46 <br /> 12.4.3.5.1 General 46 <br /> 12.4.3.5.2 Elements 46 <br /> 12.4.3.5.2.1 Resources 46 <br /> 12.4.3.5.2.2 No Material Variations 46 <br /> 12.4.3.5.2.3 Overabsorbed Overhead 47111 <br /> 12.4.4 Inefficiencies 47 <br /> 12.4.4.1 Adjustment of Contract Sum 47 <br /> 00 7200 - iv GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.