My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9606 19TH AVE SE PREMIER STORAGE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9606
>
PREMIER STORAGE
>
9606 19TH AVE SE PREMIER STORAGE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:25:58 AM
Creation date
4/22/2020 2:39:43 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9606
Tenant Name
PREMIER STORAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Receipt # 202 I I <br />X Cost of Work Order <br />Cost of Service Order <br />Contact Person Jeff Norris <br />Requested By Gordon Witcher <br />PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />Everett WA 98201 <br />425-257-8800 <br />refelSawilm <br />K;E IM( <br />Property Owner (name) Investment Development Corp <br />Charge Cost to (name if different than owner) <br />Address 5729 Lakeview Dr NE #200 City <br />Installation Location 9610 19th Ave SE <br />Kirkland <br />Date Paid <br />Work Order# e'7U /' 12�5 <br />c-- <br />Service Order # <br />Telephone # 425-486-2266 <br />Date of Request 10/29/12 <br />Zip 98033 <br />Installation type/description/size/etc. Cut in an 8" x 6"cross into existing 6" main to connect a <br />contractor installed 8" main, Contractor to excavate, shore and restore. <br />❑ T1ie following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />"Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER NIAYHAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />2709.00 <br />814.00 <br />200.00 <br />65.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Gordon Witcher <br />Matt Welborn <br />Mike Ward <br />Randy Allen <br />TOTAL /3/78/8.00 <br />Prepared by: Mike Ward �/� Gt/ Date Estimate Prepared 1112112 <br />Accepted by: Representing <br />F,STMIATE GOOD FOR 6 MONTHS <br />S AgCommonkl ericallCostestU012% <br />
The URL can be used to link to this page
Your browser does not support the video tag.