Laserfiche WebLink
Work Activity Work Order <br />Pace 2 <br />2/20/2013 10:11 <br />Issued By WMW WARD, MICHAEL W. <br />Issued Department Pw PUBLIC WORKS <br />Date Issued 11/1312012 <br />Fund 401 Accounts Program 710 Function 119 Activity 673 <br />Program <br />Title TAP 8 INCH 96C3 19TH AVE SE 710119673 <br />Work Order No 20122551 Project Activity Type CORRECTIVE MAINTENANCE Status PR <br />Status 11/13120,12 Time 13 24 Original WO Billing <br />Recommended Action <br />Approved By Job Cost Information(YIN) _ <br />Start Date r r / Time Date Completed // / Z,) ZZ —7 Permit No <br />Completed Byar P Jf i� Time Follow Up? <br />Problem Details <br />8" ON 12" TAP AND CONNECTION. CONTRACTOR TO EXCAVATE SHORE <br />RESTORE AND LAY PIPE A CROSS 19TH TO WEST CURB. <br />ESTIMATE OF $2364 PAID BY CHECK # 1033 FROM PREMIER STORAGE <br />BILL TO: PREMIER STORAGE EVERETT LLC <br />5729 LAKEVIEW DR NE #200 <br />KIRKLAND WA. 98033 <br />PH# 425-485-2266 <br />Structure ID StrT Activi Comp] Date <br />WML1785NOI WAMAIN <br />Address 9620 19TH AVE SE <br />Cross Street <br />Area Designator Structure Location <br />Map Reference 19TH AVE SE- SE INT BURLEY DR <br />Location <br />Comments <br />