Laserfiche WebLink
Subsurface Exploration, Geologic Hazard, and <br />St. Mary Magdalen Sport Court Preliminary Geotechnical Engineering Report <br />Everett, Washington Project and Site Conditions <br />1. PROJECT AND SITE CONDITIONS <br />1.0 INTRODUCTION <br />This report presents the results of our subsurface exploration, geologic hazard, and preliminary <br />geotechnical engineering study for the proposed St. Mary Magdalen Sport Court in Everett, <br />Washington. Our recommendations are preliminary in that project plans are still under <br />development at the time of our exploration and preparation of this report. The location of the <br />project site is shown on the Vicinity Map, Figure 1. The existing and currently proposed site <br />conditions and approximate locations of the explorations accomplished for this study are <br />presented on the Site and Exploration Plan, Figure 2. If there are any substantial changes in <br />the nature, design, or location of the proposed improvements, the conclusions and <br />recommendations contained in this report should be reviewed and modified, or verified, as <br />necessary. <br />1.1 Purpose and Scope <br />j The purpose of this study was to provide subsurface data to be used in the preliminary design <br />and construction of the new sport court. Our study included a review of selected geologic <br />literature, excavating exploration pits, and performing geologic studies to assess the type, <br />thickness, distribution, and physical properties of the subsurface sediments and shallow grc-und <br />water conditions. Preliminary geotechnical engineering studies were completed to formulate <br />our recommendations for site preparation, site grading, foundation construction, slab subgrade <br />preparation, and drainage. This report summarizes our current fieldwork and offers <br />development recommendations based on our present understanding of the project. We <br />recommend that we be allowed to review project plans prior to construction to verify that our <br />geotechnical recommendations have been correctly interpreted and incorporated into the <br />design. Additional exploration or design modifications/review may be required to finalize <br />project documentation. <br />1.2 Authorization <br />Written authorization to proceed with this study was granted by Mr. Marty Robinett by means <br />of an e-mail authorization on March 26, 2006. Our study was accomplished in general <br />accordance with our verbal scope of services as discussed with Mr. Robinett. This report has <br />been prepared for the exclusive use of Robinett Development and their agents for specific <br />application to this project. <br />April 24, 2006 .ASSOCIATED GIRTH SCIF.NCrS, INC. <br />RAPAn - A'Eo6o2wA/ - Pnieas12006026011CF.It4'P Page I <br />