Laserfiche WebLink
JAI C 1 <br /> SC-740 SYSTEM NOTES 5.52' • m <br /> • <br /> 11.00' / 25.25' PAVEMENT PER PLAN Z <br /> Id a,a!,m.as m.m,m,it It a!,a!,a6 d�,a!,a6 at�,a!,al,a6 al.91,a!,al\-77.Jl,db al,a.dG a.d!,aµ,al.d!,di,ad Z <br /> 1. STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE ^/\� \ _ <br /> ll <br /> • <br /> CLEAN, CRUSHED, ANGULAR AASHTO#5 j `�j /''" \/�j40 MIL HDPE IMPERMEABLE //,/. j' %/' j j/ �/�• . = W Q <br /> MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A t, <br /> PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. STONE EXTENDED TO EXCAVATION WALL \/�\//\//\// <\/.\MEMBRANE , , , C /\// /A\�/\ �\ A\ /\ /\ Z <br /> .� �� �,'r-•r+n ��y�i �y¢yr t�,,s•r� :��r-tiz� Lu <br /> GSL-��1G 0 a. .�4 a .t + �A• �0`+ �.`'',' -�'.�`I�.I+' <br /> r i>-s rrryi!+�yK��r y <br /> H <br /> 2. MANUFACTURERSTORMTCTINSTRUCTIONS CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH N NON-WOVEN GEOTEXTILE OVER IMPERMEABLEr_• f e,.X•Y �Ys r 0 <br /> o -- -- GEOTEXTILE AT SIDES AND BASE IOWA. 111101 Y� /�w�� :7\ <br /> �U% u/ '- _'O / j �"•� �"► \ ^ / ^ \ ' 06 <br /> ^^ EXCAVATION WALL, CAN .� I I // �- • ; M • <br /> A DOZER OR AN EXCAVATOR BE SLOPED OR VERTICAL r\ ' I! \ n •3. SHAMTED AREVER TOT TO BEBACKFILLED WITH ,'III • nn • ' INVERT Z <br /> SITUATED OVER THE CHAMBERS. O ING METHODS: _,- -- SC-740 END CAP'/\� /\�� `y''� w <br /> CHAMBERS MAY BE BACKFILLED BY ONE OF THE FOL W• STONESHOOTER LOCATED OFF THE CHAMBER BED. /// / ` ////�/ /\ / / /� / ' �// �� / / / \� w Z <br /> ON THE -- ,/ \\�\ \� � \%�\%�\j\� /\ \\�\ \\�\\�\�,\ �\ g z <br /> • BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR --FOUNDATION STONE OR SUBGRADE. 12 MIN 6 MIN <br /> EXCAVATION USING A LONG BOOM HOE COMPACTED SUBGRADE 51 12" MIN w CC <br /> • BACKFILL FROM OUTSIDE THE _- <br /> GG <br /> OR EXCAVATOR. <br /> SCOUR PROTECTIONw <br /> 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO - MATERIAL LOCATION COMPACTION / DENSITY REQUIREMENT Z <br /> PLACING CHAMBERS. FOUNDATION STONE: FILL W <br /> Q <br /> SEATED PRIOR TO 4"ADS STORMTECH INSERTA TEE A BELOW CHAMBERS FROM IN 6" MAX LIFTS, PLATE COMPACT OR ROLL TO ACHIEVE A FLAT a <br /> • <br /> 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLYTHE SUBGRADE UP TO THE SURFACE OF EACH LIFT PRIOR TO PLACING THE NEXT LIFT. w <br /> -- BASE OF CHAMBER O <br /> PLACING STONE. <br /> EMBEDMENT STONE: FILL <br /> 6. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER -- SREOENING THE 0 <br /> ENGINEER. • <br /> FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN CHAMBERS FROM THE <br /> _ B FOUNDATION STONE ('A' NO COMPACTION REQUIRED. 7) <br /> -- <br /> - LAYER) TO THE 'C' LAYER � Z o <br /> THEcc LU c\J <br /> USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS b -- ABOVE. w W <br /> 7. LIMITED: ch <br /> INITIALHEBOTTOM OF THE IS <br /> UP TO S BEGIN COED. COMPACT MPACTIONS TER 12" OF LAYERS IN 6MATERIAL v(50 ER E CHAXB FT S Z Z Q <br /> • NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. -- <br /> • ALLOWED RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE <br /> SCOUR PROTECTION PROPOSED PAVEMENT TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND w V Z � � <br /> UNTIL PROPER FILL DEPTHS ARE REACHED PER 'IF -- C SECTION, OR TO FINISHED 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. r 2 5 = v~i <br /> MANUFACTURER INSTRUCTIONS GRADE ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs. DYNAMIC 2 Lu C• Z Q <br /> • <br /> • CONTACT MANUFACTURER FOR WEIGHT LIMITS FOR CONSTRUCTION - FORCE NOT TO EXCEED 20,000 lbs. CC o� v <br /> 4"ADS STORMTECH INSERTA TEE - <br /> EQUIPMENT PRIOR TO CONSTRUCTION �'- L _ Z <br /> __ STORMTECH SYSTEM, TYPICAL SECTION N , cmc W o Y <br /> 8. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS THERMOPLASTIC LINERLU E <br /> IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. -- O ~ z f <br /> Q <br /> ce <br /> LU <br /> 9. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF <br /> THERMOPLASTIC LINER X °C N0 ed <br /> V `f' <br /> METHOD. _- 90.7" CHAMBER LENGTH w w OC Q <br /> CHAMBERS IS NOT AN ACCEPTABLE BACKFILL w <br /> r X a <br /> 22 <br /> 10. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON �, 85.4" INSTALLED LENGTH a U <br /> INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION �. 1 CORRUGATION ON THIS END 8 ocki,,, - V <br /> °� '' i BUILD DIRECTION ♦ I OVERLAP NEXT CHAMBER O <br /> EQUIPMENT. 14.22' 105.42' - - - <br /> SMALLER, <br /> OVER THIS CORRUGATION <br /> INSPECTION & MAINTENANCE • <br /> ;', THERMOPLASTIC LINER 'Ili: <br /> N <br /> 1'17-c---,. <br /> N:_ - <br /> ll q _ Cir <br /> W s v w <br /> STEP 1) INSPECT ISOLATOR ROW FOR SEDIMENT -o: -- <br /> A. INSPECTION PORTS (IF PRESENT) 1 START END r1 � d� ►�o G e�� O Z <br /> Al.. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN (1 %/f ///�/ l; -- TOP VIEW SIDE VIEW w Q C m <br /> A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED 0Fi���f����������� �� �� �/ // �� / ,.` V� aA.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF �_'� _SEDIMENT AND RECORD ON MAINTENANCE LOG `� zii.,-1'��-ADS STORMTECH ENDCAP I ' NOMINAL CHAMBER SPECIFICATIONS - U) <MI <br /> ��� _ SIZE (W X H X INSTALLED LENGTH) 51.0"X 30.0"X 85.4" CaZ • <br /> A.4. LOWER A CAMERA INTO ISOLATOR ROW FOR VISUAL INSPECTION o 12"X 12"ADS N-12 TOP MANIFOLD1 OF SEDIMENT LEVELS (OPTIONAL) I I I I I I I I I I I 12"X 12' ADS N-12 TOP MANIFOLD �, „' \ CHAMBER STORAGE 45.9 CUBIC FEET iiii1::: <br /> V Q <br /> MINVERT 561.04, NO SLOPE ;i o ci rp <br /> A.S. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF /� INVERT 561.04, NO SLOPE N ° M MINIMUM INSTALLED STORAGE* 74.9 CUBIC FEETCL <br /> NOT, PROCEED TO STEP ADS STORMTECH 30 NYLOPLAST C� �� INSPECTION PORT .� WEIGHT 75.0 lbs. < a <br /> B. ALL ISOLATOR ROWS • WITH BYPASS MANIFOLD � <br /> COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW 12.2" I 45.9" 51.0" *ASSUMES 6" STONE ABOVE, BELOW, AND BETWEEN CHAMBERS z 1 .. Lo N <br /> B.1. REMOVE } r <br /> • <br /> ISOLATOR ROW ADS STORMTECH ENDCAP THERMOPLASTIC LINER JLAYOUT fiz <br /> 6.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR <br /> ROW SYSTEM STORMTECH SC-740 DETAILS ` W <br /> THROUGH OUTLET PIPE NOT TO SCALE U • <br /> Lam <br /> i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO <br /> SCOUR PROTECTION 131.69' 29.71' = V • t C <br /> AVOID A CONFINED SPACE ENTRY O a�"_ <br /> ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS DC <br /> ENTRY IF ENTERING MANHOLE cc <br /> OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" w <br /> B.3. IF SEDIMENT IS AT, PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" cc <br /> 4'' p1 wlsilli� <br /> NOT, PROCEED TO STEP 3. PRE-CORED END CAPS END WITH "PC" 0 7, <br /> Q <br /> STEP 2) CLEAN OUT ISOLATOR ROW USING THE JETVAC PROCESS <br /> # STUB A B C � ��` <br /> A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF SC740EPE PART/SC740EPE06TPC 18.5" (470 mm) C--- 0 <br /> At <br /> 45" (1.1 m) OR MORE IS PREFERRED 6" (150 mm) 10.9" (277 mm) - A <br /> B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS SC740EPE06B/SC740EPE06BPC 0.5" (13 mm) 1 O �� X56200 <br /> SC740EPE08T/SC740EPE08TPC16.5" (419 mm) O S.0°sl <br /> 8" (200 mm) 12.2" (310 mm) I 2 NAL <br /> CLEAN -- iir- <br /> C. VACUUM STRUCTURE SUMP AS REQUIRED SC740EPE08B/SC740EPE08BPC 0.6 (15 mm) 10IIIIIria <br /> w14.5 (368 mm) m AND LIDS' RECORD SC740EPE10T/SC740EPE10TPC 10" (250 mm) 13.4" (340 mm) <br /> STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, SC740EPE10B/SC740EPE10BPC --- 0.7" (18 mm) <br /> T12.5" (318 mm) --- z N <br /> OBSERVATIONS AND ACTIONS. <br /> SC740EPE12T/SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) - 00 � <br /> CD <br /> SC740EPE12B/SC740EPE126PC 1.2" (30 mm) >- N <br /> STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE <br /> ' -77777�7777777z zaz SC740EPE15T/SC740EPE15TPC 9.0" (229 mm) --- < N <br /> STORMTECH SYSTEM. • 15" (375 mm) 18.4" (467 mm) <br /> /\ \. `. \. \ SC740EPE15B/SC740EPE15BPC p <br /> "�"t fei '' A� TEE OVER JOINTS 18" (450 mm) 19.7" (500 mm) --- 1.6" (41 mm) { Q <br /> / /i\///\///,\///, DO NOT INSTALL INSERTA 5.0" (127 mm) A Z <br /> \\/\\ .� SC740EPE18T/SC740EPE18TPC <br /> �'" ,.• ,r. SC740EPE18B/SC740EPE18BPC <br /> NOTES / +.��!:��+��� �,��\ * <br /> \\//\\/' =fir; �• , \\ /VI SC740EPE24B 24" (600 mm) 18.5" (470 mm) ( ) i Z F- wI-'-'0.1 3 mm1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST . ..._. •PVC STORM \/ ' ;- �11,II�`' ALL STUBS, EXCEPT FOR THE SC740EPE246 ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF vv // IFS ,d - w zE INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT '�i"�THE INSPECTION PIPE PER PLAN \\�\\j • �Iy�►��'i�i, THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1 V p ju.i Nbc ACCUMULATION AND HIGH WATER ELEVATIONS. z�•ilfli/l ��! li�►/I1-888-892-2694. U �� L.L.1a w `�Vi \.r � ;����I'.a��l <br /> 2. CONDUCT JETTING AND VECTORING ANNUALLY OR WHEN INSPECTION SHOWS - '�..1�� <br /> INSERTA TEE CONNECTION, //\ M <br /> ���MIN <br /> � A�l INSTALL INSERTA TEE OVER THE * FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). - v <br /> in THAT MAINTENANCE IS NECESSARY. CONCRETE COLLAR ELEVATION PER PLAN /\ BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. <br /> \ \ \\/ CENTER OF THE CORRUGATION <br /> 1 \//,/,/�://i , <br /> I PLACE ADS GEOSYNTEHETICS 315 NOTE: ALL DIMENSIONS ARE NOMINAL (9 '""' <br /> WOVEN GEOTEXTILE (CENTERED ON SECTION SIDE VIEW z Fa-- C <br /> r.N <br /> 78't INSERTA-TEE INLET) OVER BEDDING SC-740 MANIFOLD STUB DETAILS w w 0 <br /> 7 STONE FOR SCOUR PROTECTION AT SIDE <br /> H INLET CONNECTIONS. EXTEND Z <br /> r DUCTILE IRON <br /> FRAME AND COVER GEOTEXTILE 6" MIN PAST CHAMBER FOOT >- <br /> ` , z UJ ~ Q o <br /> 0 w t"' W <br /> INSERTA TEE DETAILS CONCRETE COLLAR NOT `00 <br /> `� <br /> a REQUIRED FOR UNPAVED <br /> 1111110 "totNOT TO SCALE 18„ Z H W Cr <br /> E APPLICATIONS I- & w Q <br /> CONCRETE COLLAR <br /> FINISHED SURFACE PER PLAN 2I = Q W Ci V <br /> E \Mn4rkn!' lrLrly <br /> r �` 12" NYLOPLAST INLINE DRAIN O. <br /> cC Ce Ce <br /> ® INSPECTION PORT - �A.' '• :�'. % , - \ w <br /> f oo /\j BODY WITH SOLID HINGED COVER LL- a <br /> w % �����������•. ��������������� r �\;A:. PART#2712AG4IP SOLID COVER O Q Q > w <br /> \ ,:•: <br /> 0. <br /> �, `� COVER ISOLATOR ROW CHAMBERS �/ \ \//\//\ r '7'F /\/ \/ / \\/ j � \/ 1299CGC =cC V W <br /> / / / <br /> �����/� '�\ WITH ADS GEOSYNTHETICS 601 T j \\ \\ \\ /\\/\\/\\/ INSERTA TEE CENTERED \ 4 SDR 35 PIPES W <br /> 21 <br /> _ NON-WOVEN GEOTEXTILE MIN 8'WIDTH / / / / / /�\/� • a- <br /> INVERT PER PLAN lI I� / / / / / /\\�\��\� . CORRUGATION CREST <br /> Q 1 O \ ON <br /> . / •• \\ �\ \\\ , \ \ \ \ ' \\\ CHAMBERS SC-740 CHAMER 0 U Z <br /> 4,,,.... <br /> Nillq: �. °� /// /�// //\//\'/ /\//, t ;///:///:Y//:7/ PART#4P26FBSTIP W <br /> Lac • <br /> WATER TIGHT JOINT �- !dimv. 1 SC-740 END CAP _ <br /> ° � . .. .�.,.. <br /> NORTH w11111111111111111 IIWPER MANUFACTURER "� I',; ; ( - b l; ICONNECT TO MANIFOLD SYSTEM rr ,i;ir' �$0 �'1:4'� : 1,1i I I <br /> IihIh1_ w <br /> 1E NI , (n 1111111. <br /> 1111h►i�d�I'il►�i.,� ��I�"�� "�� �, I�. �. ti Imil N <br /> SPECIFICATIONS _ .I n 1 ► ►,., - • - IN ��, i�l iI i�l i.�I: i�l '! <br /> I11i��1 i •1, • i't �Il', VI • 1 • I �)Do c N n r l�►�►�✓1i!."�iil ,r�r�il Sh I o" I " I•.-• 0wCV •� i4►,/iA' r�IJ' \ii !0'; 'A Y In W CJ24 CORRUGATED HDPE .V'I1�►'►�n'I�'i'.;►�4 *�/I+I\:,II' ti I I I I " 1 .1 wg DETAILS SHOWN ON THIS , I\ ACCESS PIPE AS PART OF u1'�Q/�.;��'!�I� '''►. •'l�;i e'� ;I'a i' h �';' . ► Yz Q W U) p 0 <br /> �._ SHEET PROVIDED PER ADS - 30" \j\\ BACKFILL WITH CLEAN, CRUSHED, : -:r4•s / MANIFOLD SYSTEM. USE3- ADVANCE DRAINAGE SYSTEMS, ANGULAR AASHTO#5 STONE IN 12 z `" aPRE-FABRICATED END-CAP APPLY TWO LAYERS OF ADS GEOSYNTHETICS • <br /> a ADVANCED DRAINAGE SYSTEMS,INC. ® INC OFTSoCOMPACTED TO A MINIMUM I Ill <br /> OF 90/o PART#SC740EPE246 315WTK WOVEN GEOTEXTILE BETWEEN •t :'��•` :+_!; Y •'!Y,,!��'-.'=' <br /> co o` o s FOUNDATION STONE AND CHAMBERS. 5' MINIMUM � '� .N0d SHEET NO. <br /> Nib �o ASSIST Q ® FOR ADS PRODUCTS, 507- 354 LAST DRAIN BASIN 20 10 0 20 40 60 w <br /> 3W <br /> �� DANNY JONES (360) 507 2 NYLOPLAST WIDE CONTINUOUS FABRIC WITHOUT SEAMS �_ C-301 <br /> a, N . FOR ECH '! DANNY.JONES@ADSPIPES.COM NOT TO SCALE ISOLATOR ROW DETAIL INSPECTION PORT DETAIL <br /> LU <br /> o INSTRUCTIONS, AND REFERENCE PROJECT NO. <br /> N�a DOWNLOAD THE NOT TO SCALE NOT TO SCALE SCALE: 111 - 201 ~ <br /> 7, INSTALLATION APP �' ■ S128032 4 OF 7 <br /> o/b ed� <br /> o_ti o <br /> CITY OF EVERETT <br /> REVIEWED FOR PERMIT <br /> I <br />