My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9606 19TH AVE SE PREMIER STORAGE Geotech Report 2022-10-25
>
Address Records
>
19TH AVE SE
>
9606
>
PREMIER STORAGE
>
Geotech Report
>
9606 19TH AVE SE PREMIER STORAGE Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:18:25 PM
Creation date
4/23/2020 12:47:20 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9606
Tenant Name
PREMIER STORAGE
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Important Information About Your <br /> Geotechnical <br /> Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes. <br /> The following information is provided to help you manage your risks. <br /> Geotechnical Services Are Performed for • elevation,configuration,location,orientation,or weight of the <br /> Specific Purposes,Persons, and Projects proposed structure, <br /> Geotechnical engineers structure their services to meet the specific needs of • composition of the design team,or <br /> their clients.A geotechnical engineering study conducted for a civil engi- • project ownership. <br /> neer may not fulfill the needs of a construction contractor or even another <br /> civil engineer.Because each geotechnical engineering study is unique,each As a general rule,always inform your geotechnical engineer of project <br /> geotechnical engineering report is unique,prepared solely for the client.No changes—even minor ones—and request an assessment of their impact. <br /> one except you should rely on your geotechnical engineering report without Geotechnical engineers cannot accept responsibility or liability for problems <br /> first conferring with the geotechnical engineer who prepared it.And no one that occur because their reports do not consider developments of which <br /> —not even you—should apply the report for any purpose or project they were not informed. <br /> except the one originally contemplated. <br /> Subsurface Conditions Can Change <br /> Read the lull Report A geotechnical engineering report is based on conditions that existed at <br /> Serious problems have occurred because those relying on a geotechnical the time the study was performed.Do not rely on a geotechnical engineer- <br /> engineering report did not read it all.Do not rely on an executive summary. ing reportwhose adequacy may have been affected by:the passage of <br /> Do not read selected elements only. time;by man-made events,such as construction on or adjacent to the site; <br /> or by natural events,such as floods,earthquakes,or groundwater fluctua- <br /> A Geotechnical Engineering Report Is Based on tions.Always contact the geotechnical engineer before applying the report <br /> A Unique Set of Project-Specinc Factors to determine if it is still reliable.A minor amount of additional testing or <br /> Geotechnical engineers consider a number of unique, project-specific fac- analysis could prevent major problems. <br /> tors when establishing the scope of a study.Typical factors include:the <br /> client's goals,objectives,and risk management preferences;the general Most Geotechnical Findings Are Professional <br /> nature of the structure involved,its size,and configuration;the location of Opinions <br /> the structure on the site;and other planned or existing site improvements, Site exploration identifies subsurface conditions only at those points where <br /> such as access roads,parking lots,and underground utilities.Unless the subsurface tests are conducted or samples are taken.Geotechnical engi- <br /> geotechnical engineer who conducted the study specifically indicates oth- neers review field and laboratory data and then apply their professional <br /> erwise,do not rely on a geotechnical engineering report that was: judgment to render an opinion about subsurface conditions throughout the <br /> • not prepared for you, site.Actual subsurface conditions may differ—sometimes significantly— <br /> • not prepared for your project, from those indicated in your report.Retaining the geotechnical engineer <br /> • not prepared for the specific site explored,or who developed your report to provide construction observation is the <br /> • completed before important project changes were made. most effective method of managing the risks associated with unanticipated <br /> conditions. <br /> Typical changes that can erode the reliability of an existing geotechnical <br /> engineering report include those that affect: A Report's Recommendations Are Nut Final <br /> • the function of the proposed structure,as when it's changed from a Do not overrely on the construction recommendations included in your <br /> parking garage to an office building,or from a light industrial plant report. Those recommendations am not final,because geotechnical engi- <br /> to a refrigerated warehouse, neers develop them principally from judgment and opinion.Geotechnical <br /> engineers can finalize their recommendations only by observing actual <br />
The URL can be used to link to this page
Your browser does not support the video tag.