My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Waterproofing Specialists LLC 4/15/2020
>
Contracts
>
Agreement
>
Waterproofing Specialists LLC 4/15/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 9:23:00 AM
Creation date
4/27/2020 9:22:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Waterproofing Specialists LLC
Approval Date
4/15/2020
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Emergency Garage Exhaust Fair Repair EMB
Tracking Number
0002298
Total Compensation
$11,419.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY <br /> "i EVERETT CITY OF EVERETT,CONTRACTASHINGTON <br /> WASHINGTON <br /> THIS CONTRACT is made and entered into this 27th day of MarO, by and between the <br /> City of Everett, Washington, a municipal corporationti existing Sn under <br /> the laws of the <br /> State <br /> of <br /> Washington, hereinafter called the "City", and W____N— <br /> r <br /> called the "Contractor." <br /> In consideration of the sums to be paid to it by the City, Contractor uipment, and ehereby e eod to ants and <br /> build and <br /> agreesnstrtoct furnish all mlabor, <br /> liketools, <br /> manneathe work,terials, improvements, and appurtenances in accordance <br /> construct in a workmanlike <br /> with the Specifications and Plans entitled: <br /> EVERETT MUNCIPAL BUILDING — EMERGENCY <br /> GARAGE <br /> EXHAUST FAN REPAIR <br /> 2930 WETMORE AVENUE, <br /> WA <br /> The following documents ("Contract Documents") are incorporated by reference and are <br /> hereby made a part of this Contract: <br /> A. General and Special Conditions <br /> B. All provisions required by law whether included here or not <br /> C. Scope of Work <br /> D. Change Orders (if any) <br /> E. Price Proposal submitted by the Contractor <br /> F. Project Plans and Drawings (if any) <br /> G. Supplemental Drawings (if any) <br /> H. Permits (if applicable) <br /> The work shall be physically complete in all respects within twenty (20) calendar days from the <br /> date of issuance of the Notice to Proceed. <br /> 10 400.00) and is based on the price <br /> The amount of this contract is proposal submitted by the Contractor dated March 14, 2020. <br /> The basis for final payment will be the actual amount of work performed according to the Contract <br /> Documents and payments, whether partial or final, shall be me d ices spmu cified therein.ied b q lf, and <br /> d <br /> to the extent, payment (in whole or in part) is based upon ait e less tan of work actually performed, the total amount paid to Contractorthe more or maybhange ohders Contract <br /> amount stated herein and the Contractor agrees to execute one <br /> event. In no event shall the total amount paid Contractor exceed the ormore Change amount <br /> Ordees <br /> herein, unless the Contract amount has first been increased by one yments <br /> signed by the City. The City may, in its sole discretion, <br /> tdamages,�iqu dated damages amounts from aor costs <br /> otherwise due as offsets or backcharges for expenses <br /> es, <br /> for which the Contractor is liable. If the City <br /> one or more payments orhooses not offset or duct return retainagesthe <br /> damages, liquidated damages or costs f <br /> City does not waive its claim for such damages and hereby expressly reserves its right to assert <br /> a claim against the Contractor for such damages. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.