My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corporation 4/2/2020
>
Contracts
>
Capital Contract
>
Faber Construction Corporation 4/2/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 12:57:41 PM
Creation date
4/27/2020 12:57:31 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corporation
Approval Date
4/2/2020
Council Approval Date
3/18/2020
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Evergreen Branch Library Construction
Tracking Number
0001602
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> City of Everett 00 63 63 - 5 <br /> 3600 Smith Street Clean Up <br /> Schedule C. The reason for the added tax is the result of an e-mail the City of Everett received <br /> from the Department of Revenue, dated 10-15-19, and is per WAC 171. <br /> Schedule D. The three new items added under schedule D above are the result of discovery of <br /> differing site conditions, (an existing sump that was filled with water mixed with traces of <br /> hydrocarbon contaminants) which resulted in the need to adequately dispose of materials <br /> discovered and then fill-in the cleaned-up sump site. <br /> CONTRACT TIME: No additional days where added. <br /> END OF SECTION 00 63 63 <br /> 00 63 63 - 5 CHANGE ORDER -AGREED <br />
The URL can be used to link to this page
Your browser does not support the video tag.