Laserfiche WebLink
E EVERETT �. <br /> City Council Agenda Item Cover Sheet <br /> Council Bill#interoffice use Consideration: 2020 Water,Sewer,and Stormwater Comprehensive Cost of <br /> Service Study <br /> Project: 2020 Cost of Service Study <br /> Agenda dates requested: Partner/Supplier : HDR Engineering, Inc. <br /> March 11,2020 <br /> Location: Public Works <br /> Preceding action: 2016 Cost of Service Study <br /> Briefing <br /> Proposed action Fund: 401 <br /> Consent <br /> Action x <br /> Ordinance <br /> Public hearing Project summary statement:The City of Everett last performed a water sewer, <br /> Yes X No and stormwater cost of service study in 2016. The current water, sewer and <br /> Budget amendment: stormwater rate ordinance expires December 312020. Public Works needs to <br /> Yes X No perform a comprehensive,third-party analysis of utilities charges for service to <br /> ensure an equitable distribution of cost recovery. Public Works has selected HDR <br /> PowerPoint presentation: <br /> Yes X No Engineering, Inc. from the Municipal Research Services Corporation (MRSC) <br /> consultant roster and would like to contract with HDR Engineering, Inc.to <br /> Attachments: perform this comprehensive water, sewer and stormwater cost of service study. <br /> Proposed Agreement <br /> Department(s)involved: <br /> Public Works, Legal <br /> Contact person: <br /> Matt Welborn RECOMMENDATION (Exact action requested of Council): Authorize the Mayor to sign <br /> the professional services agreement with HDR Engineering, Inc.to perform a <br /> comprehensive water and sewer cast of service study in the amount of$198,715.00 <br /> Phone number: <br /> 425 257-8974 <br /> Email: <br /> MWelborn@ci.everettwa.gov <br /> Initialed b <br /> Dep rt e head <br /> Administrat <br /> - -Goun-ci- resident — — —— — <br /> 11 <br />