My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020/03/11 Council Agenda Packet
>
Council Agenda Packets
>
2020
>
2020/03/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 11:09:52 AM
Creation date
4/29/2020 11:08:20 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EEVERETT `y <br /> Project title: Call for Bids for the construction of Sewer"0" Utility Upgrades Project <br /> City Council Agenda Item Cover Sheet <br /> Council Bill# Consideration: Call for Bids <br /> Project: Sewer"0" Utility Upgrades (UP3691) <br /> Agenda dates requested: Partner/Supplier : NA <br /> 3/11/2020 Port Gardner Neighborhood. On Colby Ave from 37th to 40th and in <br /> Location: alleys between 32nd and 34th St. and Lombard Ave.and Rockefeller <br /> Briefing Ave. <br /> Proposed action Preceding action: None <br /> Consent X <br /> Action Fund: Fund 336-Utilities <br /> Ordinance <br /> Public hearing Fiscal summary statement: <br /> Yes x No <br /> Funding source will be utilities fund. <br /> Budget amendment: <br /> Yes x No Estimated expenditure for advertising for bids is$2,000.00. <br /> PowerPoint presentation: Budget is$5,600,000.00 <br /> Yes x No <br /> Attachments: Project summary statement: <br /> None <br /> Sewer"0" Utility Upgrades project will replace and upsize existing sewers to address <br /> Department(s)involved: pipe condition and capacity issues. The existing sewer mains are over 100 years old. <br /> Public Works Existing drainage structures in the right-of way will be replaced and reconnected to the <br /> Contact person: new main. Cast iron water mains installed in 1958 are prone to breaks and will be <br /> Arnie Roshak, P.E. 54/ereplaced on Colby Ave between 37th and 40th. Street illumination direct bury wiring <br /> and telemetry conduit will be replaced. Restoration will include trench patch, half width <br /> Phone number: street pavement overlay of the east side of Colby Ave.,ADA curb ramp upgrades at <br /> (425)257-7249 intersections and replacement of sidewalk both sides of the street. Alleys will be <br /> Email: repaved full width after trenches are backfilled. <br /> aroshak@everettwa.gov This <br /> project is being designed in-house. <br /> The project is ready to advertise for construction bids. There are no supplemental <br /> bidder requirements associated with this project. <br /> itia d by: <br /> rtment head <br /> Administrate Recommendation (exact action requested of Council):Authorize the call for Bids for the <br /> construction of the Sewer 0 Utility Upgrades Project. <br /> Counci resident <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.