Laserfiche WebLink
Meg Haley <br /> From: Meg Haley <br /> Sent: Monday, October 31, 2016 1:46 PM <br /> To: 'David Murphy' <br /> Cc: Jim Venturo; Steve Miller;Terri Jorgenson; Paul McKee <br /> Subject: RE: Holiday Inn permit B1610-036 <br /> Hi David, <br /> Thank you for the revised demo plans with additional text. The life safety measures during the phasing are still <br /> not clear on the drawings. We had discussed access to the second stair (new wall or hardware in the corridor), <br /> signage, access to elevators when a portion of the floor is shut down, or when the floor is completely shut <br /> down (three phases). You had suggested a life safety drawing which would identify the hardware, access, <br /> three phases of guest access to guest rooms, and egress plans. <br /> That sounds great! If you would like to send it to me, I can print it and add it to the sets. Use of color is fine, <br /> and may make the phasing plans clearer. <br /> You had also mentioned discussions with the Fire Marshal's office regarding heat detectors, sprinkler <br /> operations during demo, smoke detectors, etc. which should also be added in text to the life safety drawings. <br /> We really appreciate your help to make the transitions clear on the drawings. It will help the request for the <br /> Temporary Certificate of Occupancy process during each construction phase. Could you also please address <br /> if the main floors will be open to the public throughout all phases of demo and construction? <br /> Meg <br /> Meg 1-aRA <br /> Plan Review Architect <br /> Permit Services,City of Everett <br /> 3200 Cedar St. <br /> Everett,WA 98201 <br /> Direct: 425-257-8813 <br /> Main: 425-257-8810(Option 8)Monday-Friday 7:3Oarn-12prn&1pm-4pm,except holidays <br /> everettwa.gov/permits everettwa.gov/codes everettwa.gov/maptools <br /> From: David Murphy [mailto:dmurphy@ murphyvarey.com] <br /> Sent: Thursday, October 27, 2016 11:18 AM <br /> To: Meg Haley <br /> Subject: Holiday Inn <br /> Meg: <br /> Pleasure meeting you in person yesterday. <br /> Attached is an updated sheet A2.00 reflecting temporary measures. I also had further discussions with the Owner <br /> regarding phasing and have indicated a phasing schedule on the same sheet. I have also added conditions regarding the <br /> occupied use of portions of the building during construction. <br /> Let me know if you have any questions. <br /> David Murphy,AIA, LEED AP <br /> MURPHY VAREY, PS <br /> 1 <br />