My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST HOLIDAY INN 2020-05-04
>
Address Records
>
PINE ST
>
3105
>
HOLIDAY INN
>
3105 PINE ST HOLIDAY INN 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 10:34:09 AM
Creation date
5/4/2020 10:30:49 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
HOLIDAY INN
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley <br /> From: Meg Haley <br /> Sent: Monday, October 31, 2016 1:46 PM <br /> To: 'David Murphy' <br /> Cc: Jim Venturo; Steve Miller;Terri Jorgenson; Paul McKee <br /> Subject: RE: Holiday Inn permit B1610-036 <br /> Hi David, <br /> Thank you for the revised demo plans with additional text. The life safety measures during the phasing are still <br /> not clear on the drawings. We had discussed access to the second stair (new wall or hardware in the corridor), <br /> signage, access to elevators when a portion of the floor is shut down, or when the floor is completely shut <br /> down (three phases). You had suggested a life safety drawing which would identify the hardware, access, <br /> three phases of guest access to guest rooms, and egress plans. <br /> That sounds great! If you would like to send it to me, I can print it and add it to the sets. Use of color is fine, <br /> and may make the phasing plans clearer. <br /> You had also mentioned discussions with the Fire Marshal's office regarding heat detectors, sprinkler <br /> operations during demo, smoke detectors, etc. which should also be added in text to the life safety drawings. <br /> We really appreciate your help to make the transitions clear on the drawings. It will help the request for the <br /> Temporary Certificate of Occupancy process during each construction phase. Could you also please address <br /> if the main floors will be open to the public throughout all phases of demo and construction? <br /> Meg <br /> Meg 1-aRA <br /> Plan Review Architect <br /> Permit Services,City of Everett <br /> 3200 Cedar St. <br /> Everett,WA 98201 <br /> Direct: 425-257-8813 <br /> Main: 425-257-8810(Option 8)Monday-Friday 7:3Oarn-12prn&1pm-4pm,except holidays <br /> everettwa.gov/permits everettwa.gov/codes everettwa.gov/maptools <br /> From: David Murphy [mailto:dmurphy@ murphyvarey.com] <br /> Sent: Thursday, October 27, 2016 11:18 AM <br /> To: Meg Haley <br /> Subject: Holiday Inn <br /> Meg: <br /> Pleasure meeting you in person yesterday. <br /> Attached is an updated sheet A2.00 reflecting temporary measures. I also had further discussions with the Owner <br /> regarding phasing and have indicated a phasing schedule on the same sheet. I have also added conditions regarding the <br /> occupied use of portions of the building during construction. <br /> Let me know if you have any questions. <br /> David Murphy,AIA, LEED AP <br /> MURPHY VAREY, PS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.