Laserfiche WebLink
DAILY INSPECTION REPORT MAYES <br /> TESTING ENGINEERS <br /> Report Number: Lynnwood,WA(425)742-9360 AlferracDn COMPANY <br /> Service Date: 5723/1 g Tacoma,WA(253)584-3720 <br /> Portland,WA(503)281-7515 <br /> Inspection Type: T- <br /> Client Project <br /> e1 ; dc Z- N evtn.e <br /> Engineer: Project Number: 't (` '7 / l s6 <br /> Architect: Permit Number: <br /> Contractor: Weather: C LG A rt <br /> r/t Zit. .A.J-4- ce f-ed y <br /> WA-3o C r Z Ze w e--1-0 eV(J 6 c.,�A{ti �O rt) 4,1- <br /> A/Z-5 tt,/kL y� c �,'7 ✓ .NCe C/� rE(LZet <br /> To the best of our knowledge,all items inspected as noted above were in general es C Preliminary Observations <br /> Conformance with the approved plans and specification. l No L Deficiency Corrected-Report No. <br /> [Arrival: I Departure: I Travel Time: I Total: <br /> _. r'Sf1M WPI O6tM00i 4 N1iAiI�B �f§il, p . (, <br /> C - <br /> TERRACON FIELD REPRESENTATIVE REVIEWED BY <br /> THIS REPORT IS CONSIDERED PRELIMINARY AND SUBJECT TO CHANGE PENDING REVIEW BY OUR PROJECT MANAGER. <br /> FINALIZED FORM SHALL BE ISSUED WITH PROJECT MANAGER SIGNATURE. <br /> This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our co pany. <br /> (971?) <br /> M7 DtR.5,31-17 <br />