Laserfiche WebLink
• <br /> Hollander RFI No.001 <br /> Development Request for Information <br /> LLC <br /> Project:Seattle Everett Delta Date:11-14-2018 <br /> To: Project Archtect: From:Dave Hermann Hollander Development <br /> To: Structural Engineer:DCI Engineering Date Response Required: 11-20-2018 <br /> To:Project Civil Engineer: Copied to:David Owen <br /> Request:Det.8/S3.1M Clarification <br /> Timeline <br /> Description Request <br /> Detail 8JS3.1M calls for removing the granulated roofing material between the CMU parpet wall and <br /> the sign connection plate.In an attempt to do so we have found it to be extremely difficult and <br /> impracticle to do. <br /> Propose Solution(If Applicable): <br /> We propose leaving the material in place,use backer rod as a dam between the wall and plate and <br /> pour a high density non-shrink grout between the wall and plate. <br /> See sketch attached <br /> By: Dave Hermann Signature Date: 11/15/2018 <br /> Response: Date: <br /> This is acceptable to DC1 Engineers. Timeline to <br /> Description Complete <br /> DCI Engineers I _ <br /> By:Craig A Stainer, P.E. S.E.Signature t / Date: 11/15/18 <br /> Change order or Request for Additional Work Required?: No x Yes <br /> Cost Impact to Project?: No x Yes <br /> Schedule Impact to Project?: No x Yes <br /> ja, <br />