My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3105 PINE ST DELTA HOTEL 2020-05-04
>
Address Records
>
PINE ST
>
3105
>
DELTA HOTEL
>
3105 PINE ST DELTA HOTEL 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 11:37:07 AM
Creation date
5/4/2020 11:28:11 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
3105
Tenant Name
DELTA HOTEL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/2/2019 City of Everett Page <br /> 8:33:51AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1805-025 Site Address 3105 PINE ST <br /> Applied 5/15/2018 Applicant Lot <br /> Approved 10/4/2018 Owner HOLLANDER INVESTMENTS INC Block <br /> Issued 10/5/2018 Contractor OWNER Tract <br /> Parent Permit No. S1803-001 Description CONST OF SIGN MARQUEE&STRUCTURAL COMPONENTS <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/25/2018 10/25/2018 BLDG 14-FINAL DWF CORRECTION Need engineer <br /> approval. <br /> 11/29/2018 11/29/2018 BLDG DWF PARTIAL APPR Roof-top Mounting <br /> 08-FRAMING Signage Brackets to parapet-wall <br /> 9 Locations-Grout-Non-shrink CMU wall <br /> Plans-S3.Im detail 11&12 <br /> Also detail revision DCI Engineers <br /> OK to cover-9 plate areas only parapet <br /> 5/8/2019 5/8/2019 BLDG 14-OTHER DWF PARTIAL APPR Rooftop sign install. <br /> Parapet connection-inspected by Mayes <br /> Testing.Roof connection and attachment to <br /> CMU wall next to roof access man door as <br /> per revised plans. <br /> Roof area-ok to cover. <br /> Provide a final letter from Mayes testing at <br /> building final. <br /> 6/12/2019 6/12/2019 BLDG 15-FINAL DWF APPROVAL Dave Herman 253-208-9369 <br /> Need final letter from Mayes special <br /> inspection-signage on roof top attachment. <br /> 6/12/2019 6/12/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 6/19/2019 6/19/2019 SPECIAL DWF APPROVAL SEE NOTES Need structural approval for mounting from <br /> INSPECTION DCI engineering and city engineer Drew <br /> Martin. <br /> (6/19/2019 8:31 AM TJJ) <br /> Received special inspection letters from <br /> Mayes Testing for final approval. <br /> INSP12 YsTEms <br />
The URL can be used to link to this page
Your browser does not support the video tag.