Laserfiche WebLink
8/2/2019 City of Everett Page <br /> 8:33:51AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. B1805-025 Site Address 3105 PINE ST <br /> Applied 5/15/2018 Applicant Lot <br /> Approved 10/4/2018 Owner HOLLANDER INVESTMENTS INC Block <br /> Issued 10/5/2018 Contractor OWNER Tract <br /> Parent Permit No. S1803-001 Description CONST OF SIGN MARQUEE&STRUCTURAL COMPONENTS <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 10/25/2018 10/25/2018 BLDG 14-FINAL DWF CORRECTION Need engineer <br /> approval. <br /> 11/29/2018 11/29/2018 BLDG DWF PARTIAL APPR Roof-top Mounting <br /> 08-FRAMING Signage Brackets to parapet-wall <br /> 9 Locations-Grout-Non-shrink CMU wall <br /> Plans-S3.Im detail 11&12 <br /> Also detail revision DCI Engineers <br /> OK to cover-9 plate areas only parapet <br /> 5/8/2019 5/8/2019 BLDG 14-OTHER DWF PARTIAL APPR Rooftop sign install. <br /> Parapet connection-inspected by Mayes <br /> Testing.Roof connection and attachment to <br /> CMU wall next to roof access man door as <br /> per revised plans. <br /> Roof area-ok to cover. <br /> Provide a final letter from Mayes testing at <br /> building final. <br /> 6/12/2019 6/12/2019 BLDG 15-FINAL DWF APPROVAL Dave Herman 253-208-9369 <br /> Need final letter from Mayes special <br /> inspection-signage on roof top attachment. <br /> 6/12/2019 6/12/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 6/19/2019 6/19/2019 SPECIAL DWF APPROVAL SEE NOTES Need structural approval for mounting from <br /> INSPECTION DCI engineering and city engineer Drew <br /> Martin. <br /> (6/19/2019 8:31 AM TJJ) <br /> Received special inspection letters from <br /> Mayes Testing for final approval. <br /> INSP12 YsTEms <br />