Laserfiche WebLink
Component Performance Path, pg. 2 ENV-UA <br /> 2015 WSEC Compliance Forms for Commercial Buildings including R2, R3,&R4 over 3 stories and all R1 Revised Jun 2016 <br /> Project Title: Everett Delta Hotel Date 09/19/2017 <br /> Fenestration Area as%gross above-grade wall area 24.3% Max.Target: 30.0% For Building Department Use <br /> Skylight Area as%gross roof area Max.Target: 3.0% <br /> Building Component Proposed UA Target UA <br /> Ins. R Plan/Detail# F-factor Source&Table#8 F-factor x Perimeter =UA(U x A) F-factor x Perimeter= UA(U x A) <br /> 73 12=10 0.540 110 59.4 0.540 110 59.4 <br /> c <br /> a) R= Slab-On-Grade F-0.54 <br /> 2 L <br /> c D R= <br /> O -o R= 0.550 <br /> _0 c <br /> R= I Heated Slab-On-Grade F-0.55 <br /> = R= <br /> Schedule ID U-factor Source9'10 U-factor x Area(A) =UA(U x A) U-factor x Area(A)= UA(U x A) <br /> CD 0.37 <br /> CET) <br /> .ET) Opaque Swing Doors U-0.37 <br /> co (n <br /> O <br /> a 0.34 <br /> .c I Opaque rollup&sliding U-0.34 <br /> O I <br /> To 0.30 <br /> Q) Non-Metal Frame U-0.30 <br /> C <br /> 0 <br /> Z <br /> B,North Side Window Table C303.1.3,Metal with Thermal Break 0.36 I 104 37.4 0.38 ! 448 I 170.3 <br /> x C,East Side Breakfast ITable C303.1.3,Metal with Thermal Break I9. 1 210 75.6 Metal Frame, Fixed U-0.38 <br /> o <br /> 487-da� D,East Side Fitness Table C303.1.3,Metal with Thermal Break 0.36 I 158 56.9 <br /> c <br /> 0.40 <br /> u.. o <br /> Metal Frame,Operable U-0.40 <br /> o m <br /> O 1r, <br /> c 2 <br /> 8 A,West Side Entry Table C303.1.3,Metal with Thermal Break 0.36 ' 99 35.6 0.60 94 56.4 <br /> c <br /> f2 Metal Entrance Door U-0.60 <br /> c <br /> c <br /> 2 <br /> m 0.50 <br /> w c <br /> .c 0. All types U-0.50 <br /> m <br /> T <br /> co Q <br /> Area' UA Area' UA <br /> Target Area Adjusted Page 2 Subtotal 681 265 652 286 <br /> TO COMPLY-The Proposed Total UA shall not Page 1 Subtotal 2483 75 2512 103 <br /> exceed the Target Total UA. Project Total 3164 340 3164 389 <br /> Component Performance Compliance (UA) UA COMPLIES <br /> Note 1-If vertical fenestration or skylight area exceeds maximum allowed per C402.4.1, then Target Area Adjustment of all applicable envelope <br /> elements will be calculated automatically by the compliance form. Refer to Target Area Adjustments worksheet for this calculation. <br /> Note 2-Opaque assembly U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 3-Proposed CMU mass wall in non-Group R that meet Table C402.1.4 Footnote D requirements can enter the target U-value of 0.014 <br /> Note 4-For semi-heated spaces utilizing the wall insulation exception,enter Target Wall U-factors under Proposed Wall U-factors so exterior <br /> walls are neutral to the calculation. <br /> Note 5-Mass transfer slab edges must be covered with an assembly having an overal U-factor of 0.2. <br /> Note 6-Demising walls,doors,and vertical fenestration separating spaces with different degrees of space conditioning(unconditioned,semi-heated, <br /> fully conditioned)shall be included only on the ENV-UA form for the space with the greatest degree of space conditioning. <br /> Note 7-List Group R above grade mass walls here. List all other mass walls, Commercial and Group R,in the Opaque Walls-Above Grade section. <br /> Note 8 -Slab-on-grade F-Factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1. <br /> Note 9 -Opaque door U-factors shall come from Appendix A or calculated per approved method as specified in C402.1.5.1.A door is defined as <br /> opaque if less than 50%of the door area has glazing. <br /> Note 10-Fenestration assembly U-Factors shall be the manufacturer's NFRC product rating, which includes the glazing and frame,or shall be <br /> the default value per Section C303.1.3. <br />