Laserfiche WebLink
PUBLIC mORKS PERMIT mateApplied: 1/29/2018 <br /> City of Everett Public Works Department Public Works Permit#: PW1801-052 <br /> Parent Permit#: B1712-022 <br /> 3200 Cedar Street <br /> Everett,WA 98201 Planning Reference#: REVI17-014 <br /> (425) 257-8810 Public Works Fee: $391.65 <br /> 02 MAR 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> HOLLANDER INVESTMENTS (SERJ NATEKIN) MURPHY VAREY PS (DAVID MURPHY) <br /> 119 N COMMERCIAL ST STE 165 910 LENORA ST, STE S207 <br /> BELLINGHAM, WA, 98225 SEATTLE, WA, 98121 <br /> PHONE: 3066471916 PHONE: 2067081682 <br /> TAX PARCEL ID#: 00439075000100 SITE ADDRESS: 3105 PINE ST <br /> DESCRIPTION: SITE WORK FOR HOTEL RENOVATION <br /> Project to include localized parking lot reconfigurations. Additionally, within the right of way, approx 200LF of frontage <br /> improvmements along Pine Street. These improvements will consist of a curb bump-out, a new curb ramp, and a new <br /> driveway for access to the hotel porte cochere. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 3/1/2018. Approved <br /> plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction for <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. : <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved` VVPP/Plan. Rempver°Lpon <br /> completion of the project prior to final approval of the permit. 1,7;71> <br /> =' :-'=' .' J:•'T ` is <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked ontr roti , :� t. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if . C Byer <br /> requires use of the right-of-way for municipal purposes. `i ,'_ <br /> 10. A Landscape Inspection is required by the Planning Department prior to final by the Public Works Inspector. Contad the <br /> Planning Department at 425-257-8731 to schedule the inspection. r s; <br /> 11. Landscape plan must meet all conditions of REVI17-014. <br /> 12. This permit must be finaled in order to close out this permit/grant a Certificate of QA .angy.itgau.tj p,.jpspection lin. ;to <br /> request a Final for this permit when all items have been completed. - "-''"i'.''' <br /> Public Works Permit Fee Breakdown: - 7 <br /> Fence in ROW $25.00 <br /> Driveway Apron $45.00 <br /> Paving (16,329SF) $81.65 <br /> Erosion Control $200.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> /RAM,' iC/IX The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> 3l Z�rB expenses,or causes of action that may arise because of installation and <br /> 11 maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Signatur of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> Fl tg <br />