Laserfiche WebLink
111111111111111 <br /> 111111111111111 <br /> I' All <br /> 11111111MIM NIS <br /> E fl G I f E E R 5 memorandum Irmo <br /> DATE: December 4, 2017 JOB#: 16011-0426 <br /> TO: David Murphy <br /> CC: <br /> FROM; Craig Stainer k, <br /> SUBJECT: Everett Hotel <br /> New Rooftop Mechanical Unit <br /> DCI Engineers has reviewed the proposed location of a new rooftop mechanical unit. The <br /> new unit Is labeled as(E)AC-1.1 and is to be located on the 2"d level low roof at grid 10 <br /> between grids G and F.This is shown in the mechanical drawings by Glumac on their sheets <br /> M0.02, M2.01 and M2.01a dated 11/17/17 and titled"Everett Hotel Public Area Renovation- <br /> Tenant Improvement". <br /> The operating weight of the new unit is approximately 550 pounds with curb.The existing roof <br /> framing supporting the proposed mechanical unit is 8"thick hollow core concrete plank and <br /> the wall framing is 8"CMU. <br /> Based on our review the existing framing is adequate to support the proposed new <br /> mechanical unit. <br /> Please contact this office with any questions concerning this matter. <br /> 818 Stewart Street,Suite 1000 Seattle,Washington,98101 Phone(206)332-1900 <br /> Service Innovation Value <br />