Laserfiche WebLink
2019 System Development Fee Calculations <br /> Permit#: C1810-012 Additional Notes: <br /> Project Address: 2325 Adams Ave <br /> Project Name: New SFR <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett 4 0 <br /> Sewer District: Everett Prepared By: Sabrina Fandler ?f.. , Date: 1/18/2019 <br /> Outside City Limits? No *Adds a 25%Surcharge wv <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *Subject to Administrative Guidelines Proposed Building Use: SFR/Townhome Previous Bldg Use#1: Vacant/Undeveloped Previous Bldg Use#2: Vacant/Undeveloped Previous Bldg Use#3: Vacant/Undeveloped <br /> ProposedUnit Measure: 1 Unit Unit Measure for Use#1: - Sq.Ft. Unit Measure for Use#2: - Sq.Ft. Unit Measure for Use#3: - Sq.Ft. <br /> Note:Meter Size Used for Proposed Meter Size: 3/4" Credited Meter#1 Size: None Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $3,957.00 Water Credit#1: $0.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $5,121.00 Sewer Credit#1: $0.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: , $3,957.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $5,121.00 This fee reflects credit for existing water meter <br /> Total: $9,078.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: 50.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Permit#:U Water Sys Dev Fee Total: ✓$0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee:L $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: None For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit 5: Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: z 1,760 SF <br /> Stormwater System Dev Fee: $622.00 Add this fee to the Building Permit(or Public Works Permit if there is no building permit for the project) <br />