My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1501 BAKER AVE 2020-05-04
>
Address Records
>
BAKER AVE
>
1501
>
1501 BAKER AVE 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 1:59:56 PM
Creation date
5/4/2020 1:59:23 PM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
1501
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kelsey Heyd <br /> From: Kelsey Heyd <br /> Sent: Tuesday, December 18, 2018 11:25 AM <br /> To: 'permits@permabilt.com' <br /> Subject: B1811-020 - 1501 Baker- Proposed Detached Garage <br /> Attachments: 20181218101937217.pdf <br /> Good Morning, <br /> I'm trying to complete my review for the proposed detached garage at 1501 Baker, Permit B1811-020, and I need some <br /> additional details regarding the proposed height of the structure. <br /> The maximum height of detached accessory structures is 15' measured from the average base elevation to the peak of <br /> the roof, unless a REVII application is processed and approved.A base elevation survey has been provided (attached) <br /> indicating that the average base elevation is 111.64' and the maximum elevation allowed is 126.64'.Step 5 of the <br /> building height handout requires that these height calculations be clearly identified on at least one elevation.The <br /> elevation plan (sheet 2 of 3) indicates the structure is right at the maximum height of 15' but does not identify if that is <br /> being measured from the average base elevation. Please revise the elevation plan such that it includes the height <br /> calculations as required by the building height handout. If it proves more convenient,you are welcome to stop by the <br /> Permit Services counter to mark up the elevation plan(to scale)or you can provide a new sheet.A height survey will be <br /> required at the time of framing inspection and the required form is included in the building height handout linked above. <br /> Note:if the structure exceeds 15'in height as measured from the average base elevation, a REVII accessory building <br /> application is required and must be approved prior to issuance of the building permit.A potential alternative solution if <br /> necessary is to change the proposed roof pitch. EMC 19.07.020.L requires a minimum 6:12 roof pitch unless the roof pitch <br /> proposed is equal or greater to the roof pitch of the principal dwelling i.e. if the dwelling has a 4:12 roof pitch, the <br /> accessory structure could have a 4:12, 5:12, etc. If the proposed roof pitch does change, the plans will need to be revised <br /> accordingly and a note will need to be provided from you on the plans that the proposal is matching the roof pitch of the <br /> existing residence. <br /> If you have any questions, please let me know and I'm happy to be of assistance. <br /> Thanks, <br /> #11� CELEBRATING Kelsey Heyd <br /> 4/"1 125 Assistant Planner 1 Community, Planning& Economic Development <br /> YEARS 425.257.7275 1 3200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/planning 1 Facebook 1 Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.