Laserfiche WebLink
4INSPECTION REPORT <br /> i t _`ate Permit: c,`1 1 I -001 <br /> ,4_, ,:-.,%,._ �=, ri Contractor: Cilac-tie,Y Vtiu3 <br /> 0 ner: Cilcw ,r Vt'r;�J_ <br /> Site•�:ddrres:: z fin - 5 �` ,t_ <br /> c <br /> 'E OF INSPECTION REQUE ' ED <br /> ELECTRICAL :11 DING MECHANICAL <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwor Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ©Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑. <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> it- i-- iiv,ssP 3 <br /> ' efl(, <br /> . _______-------- <br /> r._ c - 7--/6r, <br /> Inspector: p Date: <br /> EIR(10/06) DATABAR,INC. <br />