My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2119 CHESTNUT ST A B 2020-05-04
>
Address Records
>
CHESTNUT ST
>
2119
>
2119 CHESTNUT ST A B 2020-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:48:35 PM
Creation date
5/4/2020 3:48:11 PM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2119
Unit
A B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/30/2019 Page <br /> 2:32:10PM City of Everett <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1803-025 Site Address 2119 CHESTNUT ST A&B <br /> Applied 3/29/2018 Applicant SELSOR PAUL Lot <br /> Approved 6/6/2018 Owner SELSOR PAUL&DEANNA Block <br /> Issued 6/6/2018 Contractor OWNER Tract <br /> Parent Permit No. Description REROOF,REPAIR/REPL SHEET ROCK,REPAIR INSULATION <br /> Notes REPAIR/REPLACE FIXTURES AS NEEDED.SEPARATE HEAT PUMP PERMIT REQUIRED. <br /> OTHER PLMB FIX=WATER SHUT OFF <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 8/21/2018 8/21/2018 PLUMB SDP CORRECTION Repipe the temperature and pressure drains <br /> 03-ROUGH IN with approved materials:full bore pipe,no <br /> flex. <br /> 8/21/2018 8/21/2018 MECH 04-ROUGH SDP APPROVAL As noted At final,inspector needs to see range hood <br /> IN exhaust.Please have ladder and access for <br /> inspection. <br /> 8/23/2018 8/23/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 8/23/2018 8/23/2018 BLDG DWF APPROVAL Need to post address as per IRC 319.1 to <br /> 11-INSULATION continue inspections. <br /> 8/23/2018 8/23/2018 BLDG DWF APPROVAL Need to post address as per IRC 319.1 to <br /> 09-DRYWALL continue inspections. <br /> 8/23/2018 8/23/2018 BLDG DWF APPROVAL Need to post address as per IRC 319.1 to <br /> 08-FRAMING continue inspections. <br /> 1/29/2019 1/29/2019 PLUMB 06-FINAL DXW NOT READY Anytime after 9:30am <br /> Phone:425-941-7285 <br /> 1/29/2019 1/29/2019 MECH 06-FINAL DXW NOT READY Anytime after 9:30am <br /> Phone:425-941-7285 <br /> 3/14/2019 3/14/2019 PLUMB 06-FINAL SDP APPROVAL eTRAKiT Inspection 3/13/2019 11:35 AM Paul Selsor <br /> Request <br /> Contact Name:Paul Selsor <br /> Site Address:2119 CHESTNUT ST A&B <br /> Phone:4259417285 <br /> e-Mail:Paul.Selsor@Outlook.com <br /> 3/14/2019 3/14/2019 MECH 06-FINAL SDP APPROVAL eTRAKiT Inspection 3/13/2019 11:35 AM Paul Selsor <br /> Request <br /> Contact Name:Paul Selsor <br /> Site Address:2119 CHESTNUT ST A&B <br /> Phone:4259417285 <br /> e-Mail:Paul.Selsor@Outlook.com <br /> 3/14/2019 3/14/2019 BLDG 15-FINAL DWF APPROVAL as noted 3/13/2019 11:35 AM Paul Selsor <br /> Contact Name:Paul Selsor <br /> Site Address:2119 CHESTNUT ST A&B <br /> Phone:4259417285 <br /> e-Mail:Paul.Selsor@Outlook.com <br /> (3/14/2019 3:13 PM DWF) <br /> Need electrical final. <br /> INSP12 <br /> __MINS YSTENt <br />
The URL can be used to link to this page
Your browser does not support the video tag.