My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1425 COLBY AVE 2022-05-13
>
Address Records
>
COLBY AVE
>
1425
>
1425 COLBY AVE 2022-05-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:55:59 AM
Creation date
5/4/2020 4:05:01 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1425
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# c 9-02 '-001 <br /> BUILDING PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No.of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Yes Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No_ <br /> Existing Sprinkler System? Yes_ No Unk_ Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved by: Date: <br /> Existing Fire Alarm Yes_ No_Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes No School Mitigation Reqd? Yes No <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes No #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes— No Calculated School Impact Fee: <br /> Architectural Approved: Date: School Impact Fee Credit: <br /> Structural Approved: Date: Total School Impact Fee Owed: <br /> Comments: Comments: <br /> Intake OK by: 14-kr <br /> Intake OK by: Date:274//7 <br /> PUBLIC WORKS <br /> FEES INTAKE: Checked By: 7 Date: Q— --7r-/- <br /> Plan Check Fee Comments: 3 (4 % ,)gEA/IP ciktA r7 �/ <br /> Building Permit Ir/ <br /> Surcharge High Hazard Sites(Dental,Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check 0 Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee gRoute for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee 0 PW Permit Approved-PW <br /> Sewer Fee ❑ See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes No_ Existing Bldg. <br /> Update/New Detection Yes_ No_ Existing Bldg. <br /> Update/New Chemical Yes_ No_ Existing Bldg. <br /> Update/New Fire Service Yes_ No_ Existing Bldg. <br /> Approved by: Date: <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.