Laserfiche WebLink
Building Height Handout <br /> Base Elevation Survey <br /> (For Surveyor Use Only IF a survey is required.instructions:Complete this form to determine the average base <br /> elevation of the proposed footprint or to locate the highest point of the sidewalk, whichever applies. This form is to <br /> be submitted with the building permit application include these calculations on the site plan and building plans. <br /> During framing, the Height Survey form will be required for the framing inspection. Contact the Planning <br /> Department at 425.257.8731 if the structure does not meet the height limit.) <br /> Date of Survey: rfyir1�i l PERMIT# CS1OOC Q <br /> Property Location Surveyed: t Z.S Ave C3G'?5, : Z.-v,2..a <br /> (address and/or parcel#) <br /> Description of Bench Mark: rilila A/ /C /N ASP44L ,,V6,62 ive Pam, Coe. <br /> v <br /> Bench Mark Elevation: /0C2 <br /> BOX 1 BOX 2 <br /> A= 25.3E3 <br /> B= 96.2.3 Highest point of the <br /> C= 5'8.86 sidewalk EL <br /> D= 9S'.4#14 <br /> A+B+C+D= 355 90 /4= }cp— Average Base Elevation *Submit a map showing <br /> 5, the location of the highest <br /> + Maximum Height of �' (feet) point of the sidewalk <br /> _ 14.2.4 ' Maximum Elevation Allowed abutting the property. <br /> Check: <br /> BOX 1 i, Arta.0.0E, ( s , certify that I measured the grade at the <br /> midpoints of the proposed structure at the 'I:undisturbed ground elevations/ Dapproved <br /> topography elevations for the property above. <br /> BOX 2 ❑ I, , certify that I measured the highest point <br /> of the sidewalk for e pr ert above. <br /> Signature of Surveyor Late T <br /> Company A .C.C�1: . . -4,-J � Svr e:-it,,) , 'L �ara� ,,"4. -t1.1%1IL.S.• '" <br /> `o ' <br /> 14 <br /> Address 5205 1 c / v . . v r 14. x: <br /> °ja <br /> Phone/Email z 5 ,, -rp ,c* p <br /> 'ill <br />