My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4310 COLBY AVE 2020-05-05
>
Address Records
>
COLBY AVE
>
4310
>
4310 COLBY AVE 2020-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:06:03 AM
Creation date
5/5/2020 9:05:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4310
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k / _ _-.:--.7.,,, ,-- <br /> PUBLIC' WORKSPERMIT IT teApplied: 7019 <br /> r. ® City of Everett Permit Services Rubilt--uvior Ks re um ° <br /> L 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> EEverett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $45.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MATANA LLC MATANA LLC <br /> 117 E LOUISA ST STE 230 117 E LOUISA ST STE 230 <br /> SEATTLE,WA,98102 SEATTLE,;WA,98102 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#:00582202600200 SITE ADDRESS:4310 COLBY AVE <br /> DESCRIPTION: DOWNSPOUT CONNECTION TO PERF PIPE <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 07/29/2019.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon;compl,etiojl of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt, mud, rocks,or debris to be tracked onto roadway. ' <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces wi)iV a managed <br /> on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and.the <br /> improvements located therein. y <br /> 10.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online lby <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> -4. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expensg,if the City ever requires <br /> use of the right-of-way for municipal purposes. <br /> : <br />
The URL can be used to link to this page
Your browser does not support the video tag.