Laserfiche WebLink
Kelsey Heyd <br /> From: Kelsey Heyd <br /> Sent: Tuesday, October 16, 2018 1:19 PM <br /> To: 'Ac2wash@gmail.com' <br /> Subject: 5725 Colby- DADU - C1807-011 <br /> Attachments: ADU Owner Certificate.pdf <br /> Hi AI, <br /> I received the recorded covenant for the above-mentioned project-thank you. However, I still have not received the <br /> Owner-Occupancy Certificate which is required prior to permit issuance.The certificate doesn't need to be recorded, <br /> just submit it at the Permit Counter with a transmittal sheet once it has been signed and notarized by you and your <br /> spouse. I have attached the form for your convenience. <br /> While reviewing the site plan and plan set again I realized there are still some dimensional inconsistencies. On the site <br /> plan,the lot dimensions still don't scale out to 75x150 and the setback(s)to the structure are different than what is <br /> labeled in the plan set.You note in the plan set there is a 5' setback to the existing structure and 7'-6" setback to the <br /> new addition but this isn't what is labeled on the site plan nor do the dimensions scale out. Please revise the site plan <br /> such that all dimensions are to scale and consistent with the plan set. <br /> ,— CELEBRATING Kelsey Heyd <br /> %AI;/'� 15 Assistant Planner 1 Community, Planning& Economic Development <br /> y YEARS 425.257.7275 13200 Cedar Street, 2"d Floor, Everett,WA 98201 <br /> A story worth telling everettwa.gov/planning I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 1 <br />