Laserfiche WebLink
11/4/2019 Page 2 <br /> City of Everett / \ <br /> 7:21:23AM <br /> INSPECTION ACTIVITY REPORT a <br /> 3/22/2019 3/22/2019 BLDG KMK PARTIAL APPR eTRAKiT Inspection 3/21/2019 11:11 AM Alphonso Washington <br /> 08-FRAMING Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> (3/22/2019 2:33 PM KMK) <br /> West wall anchor bolts and washers OK. <br /> leave wall open one side for inspections. <br /> 3/22/2019 3/22/2019 PLUMB SDP CORRECTION eTRAKiT Inspection 3/21/2019 11:11 AM Alphonso Washington <br /> 03-ROUGH IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> (3/22/2019 9:52 AM SDP) <br /> Methods and materials are not to code <br /> standard.Toilet needs 2"vent,shower and <br /> washer not vented properly,shower drain <br /> size needs to be 2"with a 1 1/2"vent on the <br /> trap arm.Washer p-trap needs to be above <br /> the floor 2"with a 1 1/2"vent as shown in <br /> the drawing.Increase the vent to 2"after <br /> combining the shower and washer vents. <br /> Ok to have a pre-glue inspection. <br /> 3/28/2019 3/28/2019 PLUMB SDP CORRECTION eTRAKiT Inspection 3/27/2019 2:46 PM Alphonso Washington <br /> 03-ROUGH IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> (3/28/2019 2:47 PM SDP) <br /> Prior corrections are not complete. <br /> 4/4/2019 4/4/2019 PLUMB SDP APPROVAL eTRAKiT Inspection 4/3/2019 3:30 PM Alphonso Washington <br /> 03-ROUGH IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 5/16/2019 5/16/2019 GAS 01-ROUGH IN SDP APPROVAL As noted 5/15/2019 3:22 PM Alphonso Washington <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> (5/16/2019 3:07 PM SDP) <br /> Methods and materials are ok,left an <br /> affidavit for the pressure test,will pick up <br /> at final inspection. <br /> There will be a propane tank on the side of <br /> the building to service the DADU. <br /> 5/16/2019 5/16/2019 MECH 04-ROUGH SDP APPROVAL As noted: (5/16/2019 3:05 PM SDP) <br /> IN bath exhaust,dryer exhaust and stove <br /> exhaust(stove exhaust can be recirculating) <br /> INSPI2 <br /> CRWS 115 TEM S <br />