My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5725 COLBY AVE B 2020-05-05
>
Address Records
>
COLBY AVE
>
5725
>
5725 COLBY AVE B 2020-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:26:57 AM
Creation date
5/5/2020 9:26:24 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5725
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC VORKS PERMIT Date Applied: 10/15/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1810-041 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: C1807-011 <br /> Everett,WA 98201 Planning Reference#: REVI18-025 <br /> (425)257-8810 Public Works Fee: $85.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WASHINGTON ALPHONSO C &AMEE R OWNER <br /> 5725 COLBY AVE <br /> EVERETT, WA, 98203 <br /> PHONE: PHONE: <br /> TAX PARCEL ID#: 00495800300300 SITE ADDRESS: 5725 COLBY AVE <br /> DESCRIPTION: RE-PAVING EXISTING DRIVEWAY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 10/15/2018. <br /> Approved plans must remain on job-site at all times. ..,., <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting constructih for ` <br /> consultation and to evaluate Erosion/Sedimentation control set-up. All inspections must be formally requester ee�the <br /> attached handout for phone number and online instructions to Request an Inspection. C)E- _ 1 .� <br /> 6. Install and maintain erosion control measures per City,of Everett Standards and approvecksi§WLVITADIgn. Remove upon <br /> CO <br /> completion of the project prior to final approval of the permit. CO "'�' <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. CrI <br /> .'I <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces wbe <br /> managed on-site in a manner that does not adversely affect neighboring properties, including thCity's right-of-way afgi/or <br /> easements and the improvements located therein. c) <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupan, yr C�; I. .e,,jnspection lid to <br /> request a Final for this permit when all items have been completed. Co 1%,:t ' <br /> Public Works Permit Fee Breakdown: a rFa i;f1 <br /> r• <br /> o-, <br /> Paving (1990SF) $45.00 <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> /Q/wolg The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged there.y. <br /> FINAL INSPECTION Date /, / � ' <br /> Approved as Constructed (PW Inspector) Si ature of Applicant , Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> rice <br />
The URL can be used to link to this page
Your browser does not support the video tag.