My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5725 COLBY AVE B 2020-05-05
>
Address Records
>
COLBY AVE
>
5725
>
5725 COLBY AVE B 2020-05-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:26:57 AM
Creation date
5/5/2020 9:26:24 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
5725
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/14/2019 City of Everett Page V <br /> 7:01:49AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1905-115 Site Address 5725 COLBY AVE <br /> Applied 5/17/2019 Applicant OWNER Lot <br /> Approved 5/17/2019 Owner WASHINGTON ALPHONSO C&AMEE R Block <br /> Issued 5/17/2019 Contractor OWNER Tract <br /> Parent Permit No. C1807-011 Description ELECTRICAL FOR NEW ADU <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 5/22/2019 5/22/2019 ELEC 06-ROUGH SKB NOT READY eTRAKiT Inspection 5/21/2019 6:26 AMAlphonso Washington <br /> IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 6/7/2019 6/7/2019 ELEC 06-ROUGH MCB NOT READY eTRAKiT Inspection 6/6/2019 12:10 AM Alphonso Washington <br /> IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 6/10/2019 6/10/2019 ELEC 06-ROUGH MCB NOT READY eTRAKiT Inspection 6/7/2019 4:29 PM Alphonso Washington <br /> IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 6/12/2019 6/12/2019 ELEC 06-ROUGH MCB APPROVAL eTRAKiT Inspection 6/11/2019 9:48 AMAlphonso Washington <br /> IN Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 9/12/2019 9/12/2019 ELEC 09-FINAL MCB CORRECTION eTRAKiT Inspection 9/11/2019 8:00 AMAlphonso Washington <br /> Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> (9/12/2019 11:04 AM MCB) <br /> Arc fault and gfci protection. <br /> 9/26/2019 9/26/2019 ELEC 09-FINAL SKB NO ACCESS eTRAKiT Inspection 9/25/2019 7:28 AM Alphonso Washington <br /> Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 9/27/2019 9/27/2019 ELEC 09-FINAL MCB NOT READY eTRAKiT Inspection 9/26/2019 3:37 PM Alphonso Washington <br /> Request <br /> Contact Name:Alphonso Washington <br /> Site Address:5725 COLBY AVE <br /> Phone:2069990640 <br /> e-Mail:Ac2wash@gmail.com <br /> 10/8/2019 10/8/2019 MECH 06-FINAL SDP OTHER (10/8/2019 8:17 AM SDP) <br /> The mechanical inspector will not sign off <br /> on the water heater until the electrical <br /> inspector has approved its location. <br /> 10/11/2019 10/11/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.