My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1210 W MARINE VIEW DR 2020-05-06
>
Address Records
>
W MARINE VIEW DR
>
1210
>
1210 W MARINE VIEW DR 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 8:35:22 AM
Creation date
5/5/2020 11:31:48 AM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
1210
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC mORKS PERMIT mate Applied: 9/21/2018 <br /> City of Everett Permit Services Publi�ks Permit#: PW1810-001 <br /> 3200 Cedar Street, 2nd Floor Associated Bldg Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: 52097.92 <br /> 20 MAR 2019 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT PORT OF PUD#1 OF SNOHOMISH COUNTY <br /> PO BOX 538 PO BOX 1107 <br /> EVERETT, WA, 98206 EVERETT, WA, 98206 <br /> PHONE: PHONE: 4257834327 <br /> TAX PARCEL ID#: 29051800102200 SITE ADDRESS: 1210 W MARINE VIEW DR <br /> DESCRIPTION: SITE WORK FOR ELECTRIC UTILITY SUBSTATION <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 03/15/2019. Approved <br /> plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or <br /> easements and the improvements located therein. <br /> 10. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online <br /> by selecting PW 22-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(2,600CY) . $254.00 MMR <br /> Misc. Minor Permits (Drainage Work) $25.00 0 20/g <br /> Paving (4,499SF) $45.00 CjrzF <br /> PW Planeview $151.59 <br /> PW Site Insect n $303 18 e'er Ot 41/J?7' <br /> P /Woes <br /> Stormwater System Development Fee $1,119.15 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> C/407/2.01expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Co struction (Public Works) Date for and fu •- .grees to remove same upon notice from the City and to <br /> replac- .ublic crop-' .ama d thereby. <br /> / 7 -7-0/y <br /> FINAL INSPECTION Date <br /> Approved as Constructed (PW Inspector) Sign, ur- • Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PE' IT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> 1 (C-4 Copy <br />
The URL can be used to link to this page
Your browser does not support the video tag.