My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1923 W MUKILTEO BLVD 2021-02-17
>
Address Records
>
W MUKILTEO BLVD
>
1923
>
1923 W MUKILTEO BLVD 2021-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:21:36 AM
Creation date
5/5/2020 12:01:32 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
1923
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7i PUBLIC KIRKS PERMIT Date: 6/7/2016 <br /> y Public Works Permit#: PW1606-008 <br /> City of Everett Public Works Department <br /> -- , 3200 Cedar Street Parent Permit#: B1605-011 <br /> : Everett, WA 98201 Planning Reference#: <br /> (425)257-8810 <br /> Public Works Fee$: $ 85.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> REEEVES BRAD REEEVES BRAD <br /> 1923 W MUKILTEO BLVD 1923 W MUKILTEO BLVD <br /> EVERETT WA 98203 EVERETT WA 98203 <br /> PHONE: 4253309916 PHONE: 4253309916 <br /> TAX PARCEL ID# SITE ADDRESS: 1923 W MUKILTEO BLVD <br /> PAVING FOR CONSTRUCTION OF TWO NEW 2-CAR GARAGES <br /> ADD PAVING SURFACE ASSOCIATED WITH BUILDING TWO NEW GARAGES. DOWNSPOUTS TO BE TIGHTLINED <br /> TO EXISTING HOUSE DRAINAGE AND DISCHARGED DOWN BLUFF PIPE VIA BNSF PERMIT APPROVAL. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 ,=r; i"; <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works ;—• 1-� ' i—`:—` '"' <br /> --• <br /> Department dated 6/7/2016. a. ---' ° <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7,Agt prior L.7 ., <br /> to starting construction and with other inspection requests. .-..z.,° o c '2 E"t <br /> 6. Install erosion control measures per City of Everett Standards for small parcels and ; FSI <br /> remove upon completion of the project prior to final approval of the permit. i u:, ;-3C4 <br /> 7. Keep City streets clean at all times. Nd dirt, mud, rocks, or debris to be tracked o '--- _. i <br /> roadway. ' <br /> ,� <br /> 8. Protect all existing underground utilities during construction. l" <br /> 9. Drainage pipe down bluff is contingent upon BNSF permit approval. Final in° '; _j*, <br /> 4f4*Qt t h-* E..4 <br /> maintenance and operations of the drain within the steep slope down to the diffusj r ems. ;;=?r2 g;n n r <br /> and on-site shall be the responsibility of the property owner(s). ° l" A="' z"'a':' -4' '_" ,� <br /> 10. Each driveway access point shall not exceed 10ft in width within the front yard` �°` ' -4'`="�' F` ''-' ='Cu," <br /> setback area. i �''� <br /> �.:, <br /> Public Works Permit Fee Breakdown: <br /> Paving (1960SF) $45.00 <br /> PW Plan Review $20.00 P <br /> PW Site Inspection $20.00 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> Jicaalii <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> Gv causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date ?,r'---,:i <br /> Approved as Constructed Si ture o Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> ' PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.