My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
222 W CASINO RD 2020-05-06
>
Address Records
>
W CASINO RD
>
222
>
222 W CASINO RD 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 8:25:08 AM
Creation date
5/5/2020 2:15:16 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
222
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
engineeringlc <br /> c <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION <br /> PLAN (SWPPP) <br /> The SWPPP narrative for this project can be found in Appendix C and is based on the requirements <br /> of Volume III of the 2014 SWMMWW. An NPDES permit from the Washington State Department <br /> of Ecology will not be required for the project, since the project will disturb less than one acre of <br /> land. This design will include the following TESC measures: <br /> • Temporary Stabilized Construction Entrance, per BMP C105 <br /> • Catch Basin Filters,per BMP C220 <br /> • Silt Fence,per BMP C233 <br /> The TESC elements shown are intended to be the minimum allowable. During construction,the <br /> contractor is responsible for upgrading these facilities as necessary. The implementation of the <br /> TESC plan and construction maintenance, replacement and upgrading of the TESC facilities are the <br /> responsibility of the contractor per the contract documents. The TESC facilities will be constructed <br /> prior to and in conjunction with all clearing and grading activity and in a manner in which sediment <br /> or sediment laden water does not leave the project site, enter the drainage system, or violate <br /> applicable water quality standards. <br /> • <br /> LPD Engineering, PLLC Page 8 Horizon Elementary School — Classroom Portable Installation <br /> Storm Drainage Report,June 5, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.