Laserfiche WebLink
SCENARIO: POSTDEVELOPED <br /> Number of Subbasins: 1 <br /> Subbasin : Roof <br /> Area (Acres) <br /> Impervious 0.045 <br /> Subbasin Total 0.045 <br /> ************************* LINK DATA******************************* <br /> SCENARIO: PREDEVELOPED <br /> Number of Links: 0 <br /> ************************* LINK DATA******************************* <br /> SCENARIO: POSTDEVELOPED <br /> Number of Links: 0 <br /> **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* <br /> SCENARIO: PREDEVELOPED <br /> Number of Subbasins: 1 <br /> Number of Links: 0 <br /> SCENARIO: POSTDEVELOPED <br /> Number of Subbasins: 1 <br /> Number of Links: 0 <br /> ***********Groundwater Recharge Summary************* <br /> Recharge is computed as input to Perind Groundwater Plus Infiltration in Structures <br /> Total Predeveloped Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin: Roof 5.496 <br /> Total: 5.496 <br /> Total Post Developed Recharge During Simulation <br /> Model Element Recharge Amount(ac-ft) <br /> Subbasin: Roof 0.000 <br /> Total: 0.000 <br /> Total Predevelopment Recharge is Greater than Post Developed <br /> Average Recharge Per Year, (Number of Years= 158) <br /> Predeveloped: 0.035 ac-ft/year, Post Developed: 0.000 ac-ft/year <br />