Laserfiche WebLink
Contents <br />Pate <br />PROJECTOVERVIEW.............................................................................................................................................1 <br />METHODOLOGY......................................................................................................................................................2 <br />MINIMUM REQUIREMENT #1: STORMWATER SITE PLAN........................................................................4 <br />EXISTINGCONDITIONS SUMMARY.............................................................................................................................4 <br />DOWNSTREAMANALYSIS..........................................................................................................................................4 <br />SITESOILS.................................................................................................................................................................4 <br />PROPOSED CONDITIONS SUMMARY...........................................................................................................................4 <br />MINIMUM REQUIREMENT #2: SWPPP..............................................................................................................5 <br />ELEMENT # 1: PRESERVE VEGETATION/MARK CLEARING LIMITS.............................................................................5 <br />ELEMENT #2: ESTABLISH CONSTRUCTION ACCESS...................................................................................................5 <br />ELEMENT#3: CONTROL FLOW RATES......................................................................................................................5 <br />ELEMENT #4: INSTALL SEDIMENT CONTROLS...........................................................................................................5 <br />ELEMENT#5: STABILIZE SOILS.................................................................................................................................6 <br />ELEMENT #6: PROTECT SLOPES................................................................................................................................6 <br />ELEMENT#7: PROTECT DRAIN INLETS......................................................................................................................6 <br />ELEMENT #8: STABILIZE CHANNELS AND OUTLETS.................................................................................................6 <br />ELEMENT #9: CONTROL POLLUTANTS......................................................................................................................6 <br />ELEMENT # 10: CONTROL DE-WATERING.................................................................................................................6 <br />ELEMENT#11: MAINTAIN BMPs..............................................................................................................................6 <br />ELEMENT # 12: MANAGE THE PROJECT.....................................................................................................................6 <br />ELEMENT #13: PROTECT Low IMPACT DEVELOPMENT BMPS.................................................................................6 <br />MINIMUM REQUIREMENT 0: POLLUTION SOURCE CONTROL.............................................................7 <br />MINIMUM REQUIREMENT #4: PRESERVATION OF NATURAL DRAINAGE <br />..........................................7 <br />MINIMUM REQUIREMENT #5: ON -SITE STORMWATER MANAGEMENT.............................................7 <br />Figures <br />FIGURE1. VICINITY MAP.....................................................................................................................................1 <br />Appendices <br />APPENDIX A — DRAWINGS <br />APPENDIX B — CALCULATIONS <br />APPENDIX C — ATTACHMENTS <br />Stormwater Site Plan, Including SWPPP i • . . <br />Silver Lake Elementary School Portables <br />