My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2022-05-06
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2022-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:24:04 PM
Creation date
5/6/2020 8:11:17 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Existing Stormwater Treatment and Detention Facilities <br />❖ Approximately 20% of the Existing PDA has been provided with water quality <br />treatment via a biofiltration Swale constructed in 1998 during playfield upgrades. <br />❖ In addition, the 1998 playfield upgrades provided sub -drainage for about one-half of <br />the total playfield areas. Sub -drainage does provide some attenuation of existing <br />peak flowrates. <br />Developed Site Conditions <br />The Everett Public Schools proposes to construct a new parking lot, two new access <br />points, one redeveloped access point, and also proposes to provide minor sidewalk, entry, <br />striping and signage improvements. <br />Specific elements of the project include the following: <br />AREA A -NORTHWEST PARKING <br />Northwest Parkin Area - A new parking lot is proposed located at the <br />northwesterly portion of the school site and is adjacent to SR-527. The <br />daycare/church and existing parking areas are planned to be demolished to <br />accommodate the new parking improvements. <br />North Access Improvement - Everett Public Schools intends to demolish the <br />existing child care/church facility north of the school parking lot and construct a new <br />private student and vehicular access from 127th Place SE to the new northwest <br />parking lot. <br />AREA B - LOT 7/ SOUTH ACCESS <br />Lot?/South Access Improvement - Everett Public Schools intends to acquire Lot 7 <br />and construct a new private student and vehicular (bus) access from 129t Place SE to <br />the Bus Loading Area. <br />South Bus Loadin-a/Parking Area - This parking area is located at the southwest edge <br />of the school site and is currently operating as a bus -loading zone. Except for <br />removal of pavement where Lot 7 Access Improvements tie into existing pavement, <br />only sidewalk, striping and signage improvements are anticipated. <br />AREA C - WEST PARKING LOT = SWAP or EQUIVALENT AREA <br />West Parking Area -This parking area is located at the westerly edge of the. school <br />site arid'is adjacent to SR-527. Sidewalk, striping and signage improvements are <br />anticipated. <br />SR-527 Access Improvements- The northerly entry from SR-527 to the West <br />Parking Lot is proposed to move approximately 80 feet south. The southerly access <br />from SR-527 to the West Parking Lot will not be improved with this project except <br />for anticipated striping and possible signage improvements <br />Targeted Drainage Report for Everett Public Schools Section 2 — Risk & Erosion Control <br />Silver Lake Elementary Parking Lot Expansion January G, 2003 <br />By: Perteet Engineering Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.