My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2022-05-06
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2022-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:24:04 PM
Creation date
5/6/2020 8:11:17 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Stormwater Facilities <br />•:' In order to avoid having to provide two separate relatively large stormwater <br />facilities, SC PDS Staff (Randy Sleight/Ken Crossman/120502) has allowed the <br />designation of a detention swap or equivalent area for the mitigation of increased <br />peak flows from the Lot 7/South Access area. The Equivalent or Swap Area is <br />the West Parking Lot. <br />Flow Control of increased peak flows from the Northwest Parking Lot (Area A) <br />& West Parking Lot (Swap Area) will be provided via 370 lineal feet of 96-inch <br />detention pipe located within the fill prism of the new Northwest Parking Lot. <br />Over 13,000 cubic feet of live/detention storage is being provided. <br />•'+• Water Quality Treatment for pollutants generated from the Northwest and West <br />Parking Lots will be provided via 370 lineal feet of 96-inch detention pipe located <br />within the fill prism of the new Northwest Parking Lot. Over 5,300 cubic feet of <br />dead/water quality storage is being provided.. <br />❖ Biological Treatment of pollutants generated from the Northwest and West <br />Parking Lots will be provided via a media filter designed by Stormwater <br />Management, Inc to treat the 6-month, 24-hour design storm. <br />•3 For Water Quality Treatment of Lot 7/South Access (Area B) and the South <br />Parking Lot, flows from these areas are being routed via a new conveyance <br />system to the existing biofiltration Swale. <br />See Hydrologic Calculations in Appendix A and the Preliminary Drainage Plan in <br />Appendix B. <br />END SECTION 1— SITE DRAINAGE NARRATIVE <br />Targeted Drainage Report for Everett Public Schools Section 2 — Risk & Erosion Control <br />Silver Lake Elementary Parking Lot Expansion January 6, 2003 <br />By: Perteet Engineering Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.