My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2022-05-06
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2022-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:24:04 PM
Creation date
5/6/2020 8:11:17 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L�J <br />Stormwater Technical Memorandum Perteet <br />2707 Colby Avenue Suite 900 Everett, WA 982011 P 425.252.7700 1 F 425.339.6018 <br />To: Kelli Smith, AIA, Dykeman Architects <br />From: Erik Emerson, PE <br />Date. April 21, 2015 <br />Re: New Portable Classrooms at Silver Lake Elementary School <br />Stormwater Impacts and Mitigation Measures <br />The Everett School District proposes to place six new portable classrooms and one new portable restroom <br />within an existing playfield at Silver Lake Elementary. The portables will be accessed by a raised walkway <br />through which rainfall and sunlight will be able to penetrate. Other improvements will be limited to utility <br />connections to the temporary structures and minor clearing of the footprint of each temporary structure. The <br />new portables will create approximately 5868 square feet of new impervious area. As such, Stormwater <br />impacts of the project must be addressed. This memorandum documents the projeces compliance with the <br />City of Everett's stormwater standards as defined in the City's 2010 Stormwater Management Manual <br />(Stormwater Manual). <br />A 2003 report (Targeted Drainage Report for Silver Lake Elementary Parking Lot Expansion, Perteet, 2003) <br />examined the drainage patterns and facilities within the entire Silver Lake Elementary site (see attached). The <br />associated project constructed a new parking lot in the northwest corner of the site and other paved areas <br />within the site. The increase in runoff was mitigated by construction of stormwater facilities under the new <br />parking lot. A subsequent modernization project was constructed in 2007 and included removal of some <br />structures and additional building construction. A Schematic Design Narrative (Pace, 2006) documented that <br />the project caused a net reduction in impervious area and that new pollution generating areas were routed to <br />an existing bloswale located north of where the current project proposed to install new portables. Both <br />reports are attached to this memorandum. The 2003 report contains an offsite analysis and basin maps which <br />are still applicable to the site. <br />Construction of the new portables will add a small amount of new impervious area, but will not add any new <br />pollution generating surfaces. Therefore, water quality mitigation is not required. The new portable structures <br />will be installed on an existing grassed play field which will remain as a grassed area. Immediately below each <br />portable structure the manufacturer requires that topsoil be removed and replaced with a layer of gravel, <br />matching the structure footprint. To mitigate the impacts of adding additional impervious surface to the site <br />the roof drains will be routed to the gravel zone and allowed to infiltrate in much the same manner as does in <br />the current condition. Water will be stored in the gravel zone below the structure and allowed to slowly <br />infiltrate over time. This approach follows the intent of the low impact development methodology by <br />retaining stormwater at the point of generation and providing an opportunity to infiltrate rather than <br />collecting and routing to a single facility. The gravel depth will be increased to a nine inch minimum depth <br />which will allow full infiltration in all storms up to the 100 year recurrence (see attached WWHM calculations.) <br />The gravel layer will be specified as gravel backfill for drains to ensure that sufficient void space is available to <br />store the runoff until it infiltrates. The following assumptions have been made in the design of this facility: <br />Page 1 <br />File location: x:\Everett Public Schools\Projects\20150040 - Silver Lake Elementary Portables\Design\Drainage\Silver Lake Elementary Drainage <br />Memorandum - Everettdocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.