Laserfiche WebLink
TARGETED DRAINAGE REPORT SECTIONS <br />1. Site Drainage Narrative <br />2. Risk Assesment and Erosion Control <br />3. Upstream Analysis <br />4. Downstream Analysis <br />5. Geotechnical Reports <br />6. Basin Maps <br />LIST OF TABLES <br />Table 1 <br />Summary of Project Drainage Areas <br />Table 2 <br />Summary of Peak Flow Rates (Cubic Feet Per Second) <br />Table 3 <br />Summary of Detention Volumes <br />Table 4 <br />Summary of Water Quality Design <br />LIST OF FIGURES <br />Figure 1.0 <br />Vicinity Map <br />Figure 1.1 <br />Site Aerial <br />Figure 3.1 <br />Upstream Basin Map <br />Figure 4.1 <br />Downstream Map 1 <br />Figure 4.2 <br />Downstream Map 2 <br />Figure 4.3 <br />Downstream Map 3 <br />LIST OF APPENDICES <br />Appendix A Hydrologic Calculations <br />Appendix B Preliminary Drainage and Grading Plan <br />Targeted Drainage Report for Everett Public Schools Section 2 — Risk & Erosion Control <br />Silver Lake Elementary Parking Lot Expansion January 6, 2003 <br />By: Perteet Engineering Page 1 of 7 <br />