My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2020-05-06
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2020-05-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 9:32:25 AM
Creation date
5/6/2020 9:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Shaffer Duplex Property <br /> • <br /> 8. Seed or sod any areas to remain unworked for more than 30 days. <br /> 9. Upon completion of the project, all disturbed areas must be stabilized and best <br /> management practices removed if appropriate. <br /> 10. All temporary erosion and sediment control measures shall be removed within <br /> 30 days after final site stabilization is achieved or after the temporary BMP's <br /> are no longer needed. Trapped sediment shall be removed or stabilized on site. <br /> Disturbed soil areas resulting from removal shall be permanently stabilized. <br /> PHASE CONSTRUCTION ACTIVITY <br /> No planned phased construction is expected. <br /> 9. CONSTRUCTION SCHEDULE <br /> BMP implementation schedule listed below is keyed to proposed phases of the <br /> construction project, and reflects differences in BMP installations and inspections that <br /> relate to wet and dry season construction. As such, the dry season is considered to be <br /> from May 1 to September 30 and the wet season is considered to be from October 1 <br /> to April 30. <br /> • Estimate of Construction start date: 06/01 /2018 <br /> • Estimate of Construction finish date: 09/30/2018 <br /> • Mobilize equipment on site: 06/01 /2018 <br /> • Clear and Re-grade site 06/03 /2018 <br /> • Install new Utilities 06/ 15 /2018 <br /> • Begin building construction 07/01 /2018 <br /> • Complete House and Final site stabilization 09/30/2018 <br /> 10. FINANCIAL/OWNERSHIP AND RESPONSIBILITIES <br /> Current Owner(s): <br /> Don Schaffer <br /> PO Box 232 <br /> North Lakewood,WA 98259 <br /> Bonds and Financial Responsibility <br /> Prior to issuance of the grading, the owner/developer is required to establish the <br /> necessary erosion control and drainage bonding with Snohomish County. Along <br /> with that,the permits will require establishing general liability insurance from the <br /> proposed contractor. <br /> ,11 <br /> JOB NO:17-1666-A 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.